Electrical Installation: Bottom Cable Entry

Preparation for bottom cable entry

a.Loosen bolts of both cable entry covers and remove.

b.Drill holes for conduits for AC, Battery, and Output circuit grounding electrode cable in areas shown.

c.Install conduits.

d.Remount covers.

Interchange of AC IN busbars for bottom entry

a.Remove nuts from M14 bolts at busbars 90 and 92.

b.Remove bolt, washer and fuse.

c.Remove bolts from M10 at busbars 90 and 92.

d.Remove busbars 90 and 92 at AC IN.

e.Move the two front insulators in the topmost busbar position two stud positions to the front.

f.Move the two front insulators in the lowest busbar position two stud positions to the rear.

g.Install busbar 90 in original position of busbar 92.

h.Install busbar 92 in original position of busbar 90.

i.Reattach bolts at busbars 90 and 92.

j.Install cable lugs on busbars using M12 bolts.

Interchange of AC OUT busbars for bottom entry

a.Remove nuts from M14 bolts at busbars 93 and 95.

b.Remove bolt, washer and fuse.

c.Remove bolts from M10 at busbars 93 and 95.

d.Remove busbars 93 and 95 at AC OUT.

e.Move the two front insulators in the topmost busbar position two stud positions to the front.

f.Move the two front insulators in the lowest busbar position two stud positions to the rear.

g.Install busbar 93 in original position of busbar 95.

h.Install busbar 95 in original position of busbar 93.

i.Reattach bolts at busbars 93 and 95.

j.Install cable lugs on busbars using M12 bolts.

Moving busbar for grounding

a. Move busbar for grounding from upper right corner to lower left corner as illustrated.

14

Symmetra MW 1000 kW 480 V Installation - 990-4112E

Image 18
Contents Installation Page Contents Specifications Safety Symbols used in this guideInstallation safety EPOInverter Section UPS SectionsSerial number Control SectionConfigurations Configuration 1 Inverter Section placed to the leftConfiguration 2 Inverter Section placed to the right Total width of UPS sections 4138 mm/163 WeightExternal Bypass Static Switch Typical UPS Wiring Principle Power wiring overviewExternal disconnection switches Input/Output wiring precautionsPreparing for top cable entry default Top Cable EntryBattery cable connections top cable entry Front view of Input/Output Section Ground and AC cable connections top cable entry Bottom Cable Entry Preparing for bottom cable entryElectrical Installation Bottom Cable Entry Battery cable connections bottom cable entry Battery BAT 1 + BAT 2 + IN/OUT power cable bottom entry Ground and AC cable connections bottom cable entry Bypass Static Switch Wiring Top cable entry Bottom cable entry Communication cable overview Connectionplane 0P0957Relay Board Optional Location of optional Relay BoardCommunication cables with optional Relay Board Relay Name Events that will trigger the alarm Mode Comment Relay Board functionsIN1 Page Low-Impedance/High-Impedance Grounding Low-impedance groundingHigh-impedance grounding Specifications Low-Impedance/High-Impedance Grounding Electrical Specification Installation Planning DataAC Input DC InputAC Output AC Input External Bypass SSWHeat Dissipation 16 National Electrical Code Size Temperature Rating of Cables See Table Torque specifications Recommended cable, bolt, and lug sizesRequired Breaker Settings Input and upstream breakers minimum settingsOutput and downstream breakers minimum settings Dual Utility Installation General Specifications 480 Nema990-4112E