Pre-Installation Procedures
Receiving | Inspect the package and contents for shipping damage, and |
inspection | make sure that all parts were sent. Report any damage |
| immediately to the shipping agent, and report missing contents, |
| damage, or other problems immediately to APC or your APC |
| reseller. |
Please recycle
The shipping materials are recyclable. Please save them for later use, or dispose of them appropriately.
Package contents
The package contains the following
•The Redundant Switch
•The Redundant Switch hardware kit (
Part Number | Description | Quantity | |
|
|
| |
Left Mounting Bracket | 1 | ||
|
|
| |
Right Mounting Bracket | 1 | ||
|
|
| |
Twist Locks | 2 | ||
|
|
| |
4 | |||
with washers | |||
|
| ||
|
|
|
•The 1U mounting rails
•The 1U mounting rails hardware Kit
Part Number | Description | Quantity |
|
|
|
Ornamental Screw | 4 | |
|
|
|
4 | ||
|
|
|
Cage Nut | 4 | |
|
|
|
Select the | Choose a |
installation site | 122° F), free of conductive contaminants. |
2 | APC Redundant Switch: Installation and Operation Manual |