American Power Conversion Redundant Switch operation manual Installation

Page 13

Installation

4.On each side, attach the front rail segment that you set aside in step 2 to the Redundant Switch.

a.Align the top two holes on the front rail segment with the two holes on the side (toward the rear) of the Redundant Switch.

b.Attach the rail segment with the tapered-head screws provided.

APC Redundant Switch: Installation and Operation Manual

9

Image 13
Contents APC Redundant SwitchThis manual is available in English on the enclosed CD Contents Page Before You Begin Part Number Description Quantity Pre-Installation ProceduresVoltage Source Input Load Output Available ModelsModel SU043 Model SU045-1 SU042-4Do not remove this deviceInstallation Following example shows how to attach the bracket for See Appendix a Rack-Mount Supplement Installation To the front of the Redundant Switch, connect Use two people to lift the Redundant Switch Turn on the equipment and Redundant Switch Both UPSs must be the same sine-wave model ConfigurationRestart the computer on which PowerChute plus is Function LED Display Description OperationYou can use a remotely operated Emergency Power Off EPO Function Status LED Indicator. The green Function Status Function Select LED Indicator. The three green FunctionLED Display Status of Source Problem Possible Cause Corrective Actions TroubleshootingContinuously for capability to carry a load and ability to Specification SpecificationsSU043 and SU044-1 SU045 Appendix a Rack-Mount Supplement Type of Rack Hole Type Hardware Required Except as provided herein, APC makes no warranties Warranty and ServiceExpress or implied, including warranties of merchantability Fitness for a particular purpose. Some jurisdictions doWarranty and Service Life-Support Policy Page Radio Frequency Interference USA APC Worldwide Customer Support