BEFORE USING PRODUCT
Product Configuration
The configuration of this product is shown below.
Check the contents to make sure that you have everything listed below. If you do not have all the items, contact your TOSHIBA authorized dealer or service engineer.
• | • AC Adapter | • Power Cable |
• Earth Cable | • LAN Cross Cable | • |
• Installation Manual
• Securing Screw | • Earth Cable Securing |
|
| Screw | • Approval Label |
|
|
Configuration List
• | 1 pc. | |
• | AC Adapter (1.8m) | 1 pc. |
• | Power Cable (0.3m) | 1 pc. |
• LAN Cross Cable (0.75m) | 1 pc. | |
• | Earth Cable (0.44m) | 1 pc. |
• | Securing Screw | 2 pcs. / 2 pcs. / 2 pcs. |
|
| (Used to secure the |
|
| tional Digital System. / Used to secure the rec- |
|
| ommended hub on the Multifunctional Digital |
|
| System. |
• Earth Cable Securing Screw | / Used to secure the AC adapter bracket.) | |
1 pc. | ||
|
| (Used to secure the earth cable on the GN- |
• |
| 1010.) |
| 1 pc. | |
|
| (Contains the utility software and the .pdf ver- |
• |
| sion of this manual.) |
Installation Manual | 1 pc. | |
|
| (Explains the unpacking and installation proce- |
• |
| dures.) |
Approval Label | 1 pc. | |
|
| (Affixes the approval label to the body, which is |
|
| applied to each country.) |
8 |