ADTRAN 2 x E1 user manual Glossary, Acronyms Used in this Manual

Page 59

GLOSSARY

ACRONYMS USED IN THIS MANUAL

AMI

Alternate Mark Inversion

BER

Bit Error Rate

BBP

Baseband Processor

CRC

Cyclic Redundancy Check

DCE

Data Communications Equipment

DTE

Data Terminal Equipment

ESF

Extended superframe

FCC

Federal Communications Commission

FEC

Forward Error Correction

IF

Intermediate Frequency

ISM

Industrial, Scientific, and Medical

LBK

Loopback

QPSK

Quadrature Phase Shift Keying

RF

Radio Frequency

RFC

Radio Frequency Converter

RSSI

Received Signal Strength Indicator

Rx

Receive

SF

Superframe

Tx

Transmit

HDB3

High Density Bipolar 3

CV

Coding Violation

CCS

Clear Channel Signalling

CAS

Channel associated Signalling

RMT

Remote Alarm

UA1

Unframed all 1s

RRA

Received Remote Alarm

TRACER 2 x E1 User’s Manual

49

Image 59
Contents Tracer 2 x E1 User’s Manual 61280004L2-1C R N I N G Radio Frequency Interface StatementRadio Frequency Interference Statement Table of Contents Operation Troubleshooting Appendix a SpecificationsWarranty, Ordering and Return Information GlossaryIllustrations Viii Spread Spectrum Tracer DescriptionIntroduction ApplicationsDirect Sequence Forward Error CorrectionTracer Description Channel SelectionBaseband Processor or BBP Tracer System ConfigurationE1 Interfaces VT100 RS-232 Interface Block diagram of the BBP is shown in FigureControls and Indicators Alarm ContactsIf Signal PowerFreq Non-volatile Memory Name FunctionRadio Frequency Converter or RFC Built-In Tests10. Front and Rear of Rackmount RFC Housing Antenna 100 mW Antenna SelectionUNPACK, Inspect InstallationGrounding InstallationE1 Interfaces 15 Pin RJ-48P O R T a N T Link PlanningAntenna Gain Antenna Feedline LossPath Availability Path LossGHZ, 1 Watt Transmitter Option Setting the Transmitter Power4 GHz Diplexer Setting the RFC Frequency Plan on NON 1 Watt 2.4 GHZ ModelsPlan a Plan B 8 GHz Diplexer Setting the RFC Frequency Plan on 5.8 GHZ ModelsSpreading Code Connecting the BBP and the RFCApplying Power Automatic BBP Frequency PlanRF LOW CO-LOCATING Multiple SystemsAntenna Alignment Remote Bert Alarm ContactsInstallation RS-232 Interface PasswordOperation VT100 User InterfaceSystem Status Screen OperationMain Menu Selections Tracer Main Menu Main Menu ScreenE1A Status Screen E1 Status / Configuration / LoopbackLink Performance History Screen Link Performance HistoryE1B Statistics E1A StatisticsGeneral SectionTROUBLESHOOTING4 TroubleshootingProblem Descriptions and Recommended Actions Troubleshooting Using the Front Panel IndicatorsRecommended Actions TroubleshootingCV/CRC Light on E1A or E1B is Lit when CRC is enabled LOS/OOF Light on E1A or E1B LBK-A or LBK-B is LitALM is Lit No Power LightTST Light is Lit After Pressing Remote Test Button Test Light is Lit or BlinkingRF Low Light is On Fail Light is Lit After Pressing Remote Test ButtonCV Alarm Troubleshooting Using the VT100 User InterfaceLOS Alarm RMT Alarm OOF AlarmCRC Alarm UA1 Alarm Code Sync Status Carrier Sync Status or E1 Mux Sync Status ES Values in E1A or E1B Performance History Menu Possible CauseRFC Link Up Status SES Values in E1A or E1B Performance History Menu Troubleshooting Specifications Mechanical & Environmental SpecificationsPower VT100 Terminal InterfaceRepairs and Returns WARRANTY, Ordering and ReturnWarranty SalesWarranty, Ordering and Return Information Acronyms Used in this Manual GlossaryGlossary Modem Connection DB-25 Appendix a Cable ConnectionsTerminal Connection DB-25 Personal Computer Connection DB-9Appendix a Cable Connections