Cisco Systems R2001120402 Rack Requirements, Required Equipment, Slide Rail Adjustment Range

Page 24

Chapter 2 Installing the Server

Preparing for Installation

Rack Requirements

This section provides the requirements for the standard open racks, assuming an external ambient air temperature range of 32 to 95°F (0 to 35°C).

The rack must be of the following type:

Standard 19-inch (48.3-cm) wide, four-post EIA rack, with mounting posts that conform to English universal hole spacing per section 1 of ANSI/EIA-310-D-1992.

The rack post holes can be square or round when you use the supplied slide rails.

The minimum vertical rack space per server must be one rack unit (RU), equal to 1.75 inches (4.45 cm).

The distance between the front and rear rack posts must be as follows to fit the Cisco slide rails:

For the older rails (R200-1032RAIL), 27 to 37 inches (68.6 to 94.0 cm)

For the new style rails (R2XX-G31032RAIL), 23.5 to 36 inches (59.7 to 91.4 cm)

Tip The Cisco R-Series racks and RP-Series PDUs have been designed for optimum performance with Cisco products and are available from Cisco.

Required Equipment

The slide rails supplied by Cisco Systems do not require any tools for installation, but you might want to use a tape measure and level to help level the slide rails during installation.

Slide Rail Adjustment Range

The slide rails for this server have an adjustment range of 24 to 36 inches (610 to 914 mm).

Cisco UCS C200 Server Installation and Service Guide

2-4

OL-20732-02

 

 

Image 24
Contents Cisco UCS C200 Server Installation and Service Guide Page N T E N T S Status LEDs AC Power Cord Illustrations OL-20732-02 Related Documentation AudienceOrganization Conventions Bewaar Deze InstructiesConservez CES Informations Guarde Estas Instrucciones GEM Disse Anvisninger Xii Obtaining Documentation and Submitting a Service Request Xiv Overview Optional DVD module Rear Panel Features Feature or Component Cisco UCS C200 Server LFF RAID = redundant array of independent disks Installing the Server Shipping Box Contents Unpacking and Inspecting the ServerPreparing for Installation Installation GuidelinesSlide Rail Adjustment Range Rack RequirementsRequired Equipment Installing the Server Into a Rack Attaching a Slide-Rail Assembly Attaching Mounting Brackets to the Server Attaching the Cable Management Arm Initial Server Setup Connecting and Powering On the Server Standalone ModeOL-20732-02 Cisco UCS C200 Server Installation and Service Guide NIC Modes and NIC Redundancy Settings System Bios and Cimc Firmware Updating the Bios and Cimc FirmwareAccessing the System Bios Service Jumper Locations Motherboard JumpersUsing the Bios Recovery Jumper J1E5 to Recover Corrupt Bios Clearing the Cimc Admin Password Using Jumper J45 Using the Clear Cmos Jumper J1E6 Clearing the Bios Admin Password Using Jumper J1E4 OL-20732-02 Server Configuration Utility Server Monitoring and Management ToolsCisco Integrated Management Interface Cimc Status LEDs Front Panel LEDsLED Name State CPU fault Off-All CPUs are operating properly Rear Panel LEDsLED Name State LED Name State Preparing for Component Installation Shutting Down and Powering Off the ServerRemoving and Replacing the Server in a Rack Removing and Replacing the Server Top Cover Removing the Top Cover of the ServerRemoving the Front Cover of the Server Replaceable Component Locations 6shows the Large Form Factor LFF version of the serverReplaceable Component Locations, Small Form Factor Top View Installing or Replacing Components Maintaining the Server Installing or Replacing Components 282338 Alternate Front Panel Module Cable Routing Installing Hard Drives or Solid State Drives HDD01 HDD02 HDD03 HDD04 HDD01 HDD02 HDD03 HDD04 HDD05 HDD06 HDD07 HDD08 Installing Power Supplies PSU2 PSU1Installing a Fan Tray 15 Removing and Replacing a Fan Tray Installing DIMMs Memory Performance Guidelines and Population RulesMemory Population Rules Low-Voltage Dimm Considerations Generation M2 Only Dimm Installation Procedure 17 Removing and Replacing Memory Modules Installing CPUs and Heatsinks 18 Removing and Replacing CPUs and Heatsinks Installing a Motherboard Cmos Battery Installing a Trusted Platform Module 19 Removing and Replacing a Motherboard Cmos BatteryTPM Replacing a PCIe Riser Card Assembly 21 Removing and Replacing a PCIe Riser Card Assembly Replacing a PCIe CardReplacement Procedure PCIe Slot How to Identify Which Power Supply Model is in Your Server Resolving Insufficient Memory Space to Execute Option ROMs Resolving Insufficient 16-Bit I/O Space Replacing an LSI MegaRAID Battery Backup Unit Replacing an LSIiBBU06 BBU24 Removing and Replacing an LSIiBBU06 BBU Replacing an LSIiBBU08 BBU 25 Replacing a Mounting Bracket for the LSIiBBU08 BBUScrews 27 Removing and Replacing an LSIiBBU06 BBU Installing a Mezzanine Card Mezzanine card retaining posts three Technical Specifications Physical SpecificationsEnvironmental Specifications Power SpecificationsCable and Power Cord Specifications KVM CableSupported Power Cords and Plugs Description Feet Meters IllustrationAC Power Cord Illustrations This section contains the AC power cord illustrationsCAB-9K10A-EU CAB-9K10A-SW CAB-N5K6A-NA CAB-9K12A-NA OL-20732-02 RAID Controller Considerations Supported RAID Controllers and Required CablesR200-SASCBL3 Enabling the Mezzanine Card RAID Controller in the Bios RAID Controller CablingHow to Determine Which Controller Is in Your Server Cisco UCS C200 LFF Server CablingCisco UCS C200 SFF Server Cabling How To Launch Option ROM-Based Controller Utilities From your For More Information OL-20732-02 Installation for Cisco UCS Integration OL-20732-02