Cisco Systems UCS C200 M1, R2001120402 manual Removing and Replacing the Server Top Cover

Page 49

Chapter 3 Maintaining the Server

Preparing for Component Installation

Removing and Replacing the Server Top Cover

To remove or replace the server top cover, follow these steps:

Warning This unit might have more than one power cord. To reduce the risk of electric shock, disconnect the two power supply cords before servicing the unit. Statement 14

Tip You do not have to remove the cover to replace hard drives or power supplies.

Step 1 Remove the top cover:

a.Use a Number 2 Phillips head screwdriver to remove the two screws that secure the top cover (Generation M1 only).

Note The UCS C200 Generation M2 server does not have cover screws.

b.Press down on the release button and use the nonslip pad to push the cover toward the rear about one inch, until you feel it stop sliding.

c.Lift the cover from the server and set it aside.

Step 2 Replace the top cover:

a.Set the cover in place about one inch back from the fully closed position. Use the three alignment pegs on each inside edge of the cover to align with the alignment notches on the chassis.

b.Push the cover toward the server front until the release button clicks.

c.Replace the two screws that secure the cover in place (Generation M1 only).

Figure 3-4 Removing the Top Cover of the Server

1

3

1

2

2

195723

Release button

3 Nonslip pad

Securing screws (Generation M1 only)

Cisco UCS C200 Server Installation and Service Guide

 

OL-20732-02

3-9

 

 

 

Image 49
Contents Cisco UCS C200 Server Installation and Service Guide Page N T E N T S Status LEDs AC Power Cord Illustrations OL-20732-02 Audience Related DocumentationOrganization Bewaar Deze Instructies ConventionsConservez CES Informations Guarde Estas Instrucciones GEM Disse Anvisninger Xii Obtaining Documentation and Submitting a Service Request Xiv Overview Optional DVD module Rear Panel Features Feature or Component Cisco UCS C200 Server LFF RAID = redundant array of independent disks Installing the Server Unpacking and Inspecting the Server Shipping Box ContentsInstallation Guidelines Preparing for InstallationRack Requirements Slide Rail Adjustment RangeRequired Equipment Installing the Server Into a Rack Attaching a Slide-Rail Assembly Attaching Mounting Brackets to the Server Attaching the Cable Management Arm Connecting and Powering On the Server Standalone Mode Initial Server SetupOL-20732-02 Cisco UCS C200 Server Installation and Service Guide NIC Modes and NIC Redundancy Settings Updating the Bios and Cimc Firmware System Bios and Cimc FirmwareAccessing the System Bios Motherboard Jumpers Service Jumper LocationsUsing the Bios Recovery Jumper J1E5 to Recover Corrupt Bios Clearing the Cimc Admin Password Using Jumper J45 Using the Clear Cmos Jumper J1E6 Clearing the Bios Admin Password Using Jumper J1E4 OL-20732-02 Server Monitoring and Management Tools Server Configuration UtilityCisco Integrated Management Interface Cimc Front Panel LEDs Status LEDsLED Name State Rear Panel LEDs CPU fault Off-All CPUs are operating properlyLED Name State LED Name State Shutting Down and Powering Off the Server Preparing for Component InstallationRemoving and Replacing the Server in a Rack Removing the Top Cover of the Server Removing and Replacing the Server Top CoverRemoving the Front Cover of the Server 6shows the Large Form Factor LFF version of the server Replaceable Component LocationsReplaceable Component Locations, Small Form Factor Top View Installing or Replacing Components Maintaining the Server Installing or Replacing Components 282338 Alternate Front Panel Module Cable Routing Installing Hard Drives or Solid State Drives HDD01 HDD02 HDD03 HDD04 HDD01 HDD02 HDD03 HDD04 HDD05 HDD06 HDD07 HDD08 PSU2 PSU1 Installing Power SuppliesInstalling a Fan Tray 15 Removing and Replacing a Fan Tray Memory Performance Guidelines and Population Rules Installing DIMMsMemory Population Rules Low-Voltage Dimm Considerations Generation M2 Only Dimm Installation Procedure 17 Removing and Replacing Memory Modules Installing CPUs and Heatsinks 18 Removing and Replacing CPUs and Heatsinks Installing a Motherboard Cmos Battery 19 Removing and Replacing a Motherboard Cmos Battery Installing a Trusted Platform ModuleTPM Replacing a PCIe Riser Card Assembly Replacing a PCIe Card 21 Removing and Replacing a PCIe Riser Card AssemblyReplacement Procedure PCIe Slot How to Identify Which Power Supply Model is in Your Server Resolving Insufficient Memory Space to Execute Option ROMs Resolving Insufficient 16-Bit I/O Space Replacing an LSIiBBU06 BBU Replacing an LSI MegaRAID Battery Backup Unit24 Removing and Replacing an LSIiBBU06 BBU 25 Replacing a Mounting Bracket for the LSIiBBU08 BBU Replacing an LSIiBBU08 BBUScrews 27 Removing and Replacing an LSIiBBU06 BBU Installing a Mezzanine Card Mezzanine card retaining posts three Physical Specifications Technical SpecificationsPower Specifications Environmental SpecificationsKVM Cable Cable and Power Cord SpecificationsDescription Feet Meters Illustration Supported Power Cords and PlugsThis section contains the AC power cord illustrations AC Power Cord IllustrationsCAB-9K10A-EU CAB-9K10A-SW CAB-N5K6A-NA CAB-9K12A-NA OL-20732-02 Supported RAID Controllers and Required Cables RAID Controller ConsiderationsR200-SASCBL3 RAID Controller Cabling Enabling the Mezzanine Card RAID Controller in the BiosCisco UCS C200 LFF Server Cabling How to Determine Which Controller Is in Your ServerCisco UCS C200 SFF Server Cabling How To Launch Option ROM-Based Controller Utilities From your For More Information OL-20732-02 Installation for Cisco UCS Integration OL-20732-02