Cisco Systems UCS C200 M1, R2001120402 manual Attaching the Cable Management Arm

Page 28

Chapter 2 Installing the Server

Installing the Server Into a Rack

Step 4 Attach the (optional) cable management arm (CMA) to the rear of the slide rails:

Note The orientation in these instructions refers to a view from the front of the server.

a.Slide the plastic clip on the right end of the CMA length-adjustment slider (item 2) into the rear of the right slide rail (item 1) until it clips onto the plastic retaining flange inside the slide rail. See Figure 2-5.

b.Expand the CMA length-adjustment slider (item 2) until its left end aligns with the rear of the left slide-rail assembly (item 3).

c.Slide the innermost CMA attachment clip (item 4) into the rear of the left slide rail (item 3) and clip it onto the CMA flange that is on the mounting bracket that is attached to the server.

d.Attach the two-hole slotted bracket (item 5) that is on the left end of the CMA length-adjustment slider to the left slide rail. Fit the two-hole slotted bracket over the two pegs inside the slide rail.

e.Attach the outermost CMA attachment clip (item 6) onto the CMA flange that is on the left slide rail.

Figure 2-5 Attaching the Cable Management Arm

6

2

1

5

4

3

 

 

 

 

 

 

 

 

195969

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

Rear of right slide rail (plastic retaining flange

4

Innermost CMA attachment clip

 

is inside the rail)

 

 

 

 

 

 

 

 

 

 

 

 

 

2

CMA length-adjustment slider

5

Two-hole slotted bracket on end of CMA

 

 

 

 

 

 

length-adjustment slider

 

 

 

 

 

 

 

 

 

3

Rear of left slide rail assembly

6

Outermost CMA attachment clip

 

 

 

 

 

 

 

 

 

Step 5 Continue with the “Connecting and Powering On the Server (Standalone Mode)” section on page 2-9.

Cisco UCS C200 Server Installation and Service Guide

2-8

OL-20732-02

 

 

Image 28
Contents Cisco UCS C200 Server Installation and Service Guide Page N T E N T S Status LEDs AC Power Cord Illustrations OL-20732-02 Audience Related DocumentationOrganization Conventions Bewaar Deze InstructiesConservez CES Informations Guarde Estas Instrucciones GEM Disse Anvisninger Xii Obtaining Documentation and Submitting a Service Request Xiv Overview Optional DVD module Rear Panel Features Feature or Component Cisco UCS C200 Server LFF RAID = redundant array of independent disks Installing the Server Shipping Box Contents Unpacking and Inspecting the ServerPreparing for Installation Installation GuidelinesRack Requirements Slide Rail Adjustment RangeRequired Equipment Installing the Server Into a Rack Attaching a Slide-Rail Assembly Attaching Mounting Brackets to the Server Attaching the Cable Management Arm Initial Server Setup Connecting and Powering On the Server Standalone ModeOL-20732-02 Cisco UCS C200 Server Installation and Service Guide NIC Modes and NIC Redundancy Settings System Bios and Cimc Firmware Updating the Bios and Cimc FirmwareAccessing the System Bios Service Jumper Locations Motherboard JumpersUsing the Bios Recovery Jumper J1E5 to Recover Corrupt Bios Clearing the Cimc Admin Password Using Jumper J45 Using the Clear Cmos Jumper J1E6 Clearing the Bios Admin Password Using Jumper J1E4 OL-20732-02 Server Monitoring and Management Tools Server Configuration UtilityCisco Integrated Management Interface Cimc Status LEDs Front Panel LEDsLED Name State CPU fault Off-All CPUs are operating properly Rear Panel LEDsLED Name State LED Name State Preparing for Component Installation Shutting Down and Powering Off the ServerRemoving and Replacing the Server in a Rack Removing and Replacing the Server Top Cover Removing the Top Cover of the ServerRemoving the Front Cover of the Server Replaceable Component Locations 6shows the Large Form Factor LFF version of the serverReplaceable Component Locations, Small Form Factor Top View Installing or Replacing Components Maintaining the Server Installing or Replacing Components 282338 Alternate Front Panel Module Cable Routing Installing Hard Drives or Solid State Drives HDD01 HDD02 HDD03 HDD04 HDD01 HDD02 HDD03 HDD04 HDD05 HDD06 HDD07 HDD08 Installing Power Supplies PSU2 PSU1Installing a Fan Tray 15 Removing and Replacing a Fan Tray Installing DIMMs Memory Performance Guidelines and Population RulesMemory Population Rules Low-Voltage Dimm Considerations Generation M2 Only Dimm Installation Procedure 17 Removing and Replacing Memory Modules Installing CPUs and Heatsinks 18 Removing and Replacing CPUs and Heatsinks Installing a Motherboard Cmos Battery Installing a Trusted Platform Module 19 Removing and Replacing a Motherboard Cmos BatteryTPM Replacing a PCIe Riser Card Assembly 21 Removing and Replacing a PCIe Riser Card Assembly Replacing a PCIe CardReplacement Procedure PCIe Slot How to Identify Which Power Supply Model is in Your Server Resolving Insufficient Memory Space to Execute Option ROMs Resolving Insufficient 16-Bit I/O Space Replacing an LSI MegaRAID Battery Backup Unit Replacing an LSIiBBU06 BBU24 Removing and Replacing an LSIiBBU06 BBU Replacing an LSIiBBU08 BBU 25 Replacing a Mounting Bracket for the LSIiBBU08 BBUScrews 27 Removing and Replacing an LSIiBBU06 BBU Installing a Mezzanine Card Mezzanine card retaining posts three Technical Specifications Physical SpecificationsEnvironmental Specifications Power SpecificationsCable and Power Cord Specifications KVM CableSupported Power Cords and Plugs Description Feet Meters IllustrationAC Power Cord Illustrations This section contains the AC power cord illustrationsCAB-9K10A-EU CAB-9K10A-SW CAB-N5K6A-NA CAB-9K12A-NA OL-20732-02 RAID Controller Considerations Supported RAID Controllers and Required CablesR200-SASCBL3 Enabling the Mezzanine Card RAID Controller in the Bios RAID Controller CablingCisco UCS C200 LFF Server Cabling How to Determine Which Controller Is in Your ServerCisco UCS C200 SFF Server Cabling How To Launch Option ROM-Based Controller Utilities From your For More Information OL-20732-02 Installation for Cisco UCS Integration OL-20732-02