Cisco Systems UCS C200 M1, R2001120402 manual Installing a Mezzanine Card

Page 85

Chapter 3 Maintaining the Server

Installing or Replacing Components

Installing a Mezzanine Card

The qualified and supported part numbers for this component are subject to change over time. For the most up-to-date list of replaceable components, see the following URL and then scroll to Technical Specifications:

http://www.cisco.com/en/US/products/ps10493/products_data_sheets_list.html

To install or replace a mezzanine card, follow these steps:

Step 1 Remove a mezzanine card:

a.Power off the server as described in the “Shutting Down and Powering Off the Server” section on page 3-7.

b.Disconnect all power cords from the power supplies.

c.Slide the server out the front of the rack far enough so that you can remove the top cover. You might have to detach cables from the rear panel to provide clearance.

Caution If you cannot safely view and access the component, remove the server from the rack.

d.Remove the top cover as described in the “Removing and Replacing the Server Top Cover” section on page 3-9.

e.Disconnect the cable harness from the connector on the top of the mezzanine card.

f.Use needle-nose pliers to pinch the three plastic standoff posts that hold the mezzanine card to the motherboard. Pinching the top of the post provides clearance to lift the mezzanine card off the posts (see Figure 3-28).

g.Lift up on both ends of the mezzanine card evenly to disengage its connector from the motherboard socket.

Step 2 Install a mezzanine card:

a.Place the mezzanine card in the chassis, aligning the holes on the card with the three plastic standoff posts on the motherboard.

b.Push down firmly on the card to fully engage the connector of the card with the motherboard socket.

c.Ensure that the holes in the card click down over the three plastic posts on the motherboard.

d.Reconnect the cable harness to the connector on the top of the mezzanine card.

e.Replace the top cover.

f.Replace the server in the rack, replace power cords and any other cables, and then power on the server by pressing the Power button.

 

 

Cisco UCS C200 Server Installation and Service Guide

 

 

 

 

 

 

OL-20732-02

 

 

3-45

 

 

 

 

 

Image 85
Contents Cisco UCS C200 Server Installation and Service Guide Page N T E N T S Status LEDs AC Power Cord Illustrations OL-20732-02 Audience Related DocumentationOrganization Bewaar Deze Instructies ConventionsConservez CES Informations Guarde Estas Instrucciones GEM Disse Anvisninger Xii Obtaining Documentation and Submitting a Service Request Xiv Overview Optional DVD module Rear Panel Features Feature or Component Cisco UCS C200 Server LFF RAID = redundant array of independent disks Installing the Server Unpacking and Inspecting the Server Shipping Box ContentsInstallation Guidelines Preparing for InstallationRack Requirements Slide Rail Adjustment RangeRequired Equipment Installing the Server Into a Rack Attaching a Slide-Rail Assembly Attaching Mounting Brackets to the Server Attaching the Cable Management Arm Connecting and Powering On the Server Standalone Mode Initial Server SetupOL-20732-02 Cisco UCS C200 Server Installation and Service Guide NIC Modes and NIC Redundancy Settings Updating the Bios and Cimc Firmware System Bios and Cimc FirmwareAccessing the System Bios Motherboard Jumpers Service Jumper LocationsUsing the Bios Recovery Jumper J1E5 to Recover Corrupt Bios Clearing the Cimc Admin Password Using Jumper J45 Using the Clear Cmos Jumper J1E6 Clearing the Bios Admin Password Using Jumper J1E4 OL-20732-02 Server Monitoring and Management Tools Server Configuration UtilityCisco Integrated Management Interface Cimc Front Panel LEDs Status LEDsLED Name State Rear Panel LEDs CPU fault Off-All CPUs are operating properlyLED Name State LED Name State Shutting Down and Powering Off the Server Preparing for Component InstallationRemoving and Replacing the Server in a Rack Removing the Top Cover of the Server Removing and Replacing the Server Top CoverRemoving the Front Cover of the Server 6shows the Large Form Factor LFF version of the server Replaceable Component LocationsReplaceable Component Locations, Small Form Factor Top View Installing or Replacing Components Maintaining the Server Installing or Replacing Components 282338 Alternate Front Panel Module Cable Routing Installing Hard Drives or Solid State Drives HDD01 HDD02 HDD03 HDD04 HDD01 HDD02 HDD03 HDD04 HDD05 HDD06 HDD07 HDD08 PSU2 PSU1 Installing Power SuppliesInstalling a Fan Tray 15 Removing and Replacing a Fan Tray Memory Performance Guidelines and Population Rules Installing DIMMsMemory Population Rules Low-Voltage Dimm Considerations Generation M2 Only Dimm Installation Procedure 17 Removing and Replacing Memory Modules Installing CPUs and Heatsinks 18 Removing and Replacing CPUs and Heatsinks Installing a Motherboard Cmos Battery 19 Removing and Replacing a Motherboard Cmos Battery Installing a Trusted Platform ModuleTPM Replacing a PCIe Riser Card Assembly Replacing a PCIe Card 21 Removing and Replacing a PCIe Riser Card AssemblyReplacement Procedure PCIe Slot How to Identify Which Power Supply Model is in Your Server Resolving Insufficient Memory Space to Execute Option ROMs Resolving Insufficient 16-Bit I/O Space Replacing an LSIiBBU06 BBU Replacing an LSI MegaRAID Battery Backup Unit24 Removing and Replacing an LSIiBBU06 BBU 25 Replacing a Mounting Bracket for the LSIiBBU08 BBU Replacing an LSIiBBU08 BBUScrews 27 Removing and Replacing an LSIiBBU06 BBU Installing a Mezzanine Card Mezzanine card retaining posts three Physical Specifications Technical SpecificationsPower Specifications Environmental SpecificationsKVM Cable Cable and Power Cord SpecificationsDescription Feet Meters Illustration Supported Power Cords and PlugsThis section contains the AC power cord illustrations AC Power Cord IllustrationsCAB-9K10A-EU CAB-9K10A-SW CAB-N5K6A-NA CAB-9K12A-NA OL-20732-02 Supported RAID Controllers and Required Cables RAID Controller ConsiderationsR200-SASCBL3 RAID Controller Cabling Enabling the Mezzanine Card RAID Controller in the BiosCisco UCS C200 LFF Server Cabling How to Determine Which Controller Is in Your ServerCisco UCS C200 SFF Server Cabling How To Launch Option ROM-Based Controller Utilities From your For More Information OL-20732-02 Installation for Cisco UCS Integration OL-20732-02