Siemens DTU3005-B manual Starting the Software

Page 15

3 Starting the Software

4.To select a project type, highlight the type and either press Enter or click the left mouse button. Then highlight the Ok button on the dialog box and either press Enter or click the left mouse but- ton.

5.When the screen refreshes, the Project menu is displayed with additional menu options now avail- able. These options apply to the open project file that is active (i.e., the project name appears in the top line of the screen).

Close—allows you to close a project file. (More than one project file can be open at any time.)

View—allows you to view a project informa- tion screen which shows the project file

name, project file type, the selections for each of the DTU3005’s ports, and the number of devices.

Save—allows you to save the current project file.

Save As—allows you to save the project file under a different file name.

Switch To—allows you to switch between the opened project files. (Multiple project files can be open at the same time.)

Print—allows you to print the project file’s configuration information.

6.Select Save, or use the keyboard shortcut F10 to save your new project. You are now ready to con- figure your project.

Siemens Energy & Automation, Inc.

11

Image 15
Contents DTU3005-B Qualified Personnel Table of Contents 135 Diagnostic Data FormatWarranty 134Software Overview FeaturesIntroduction Product OverviewPLC to SEAbus Application Supported PLC WinPM PLC to SEAbusModbus Master to SEAbus Modbus Master to SEAbusMulti-Drop Modbus Master to SEAbus Connection to Modbus Master using a Multidrop CableSEAbus Port Expander Siemens Energy & Automation, Inc SEAbus Port ExpanderInstalling the Software Installing the SoftwareInstalling the Software Menu Navigation Starting the SoftwareUsing the Project Menu Main MenuStarting a New Project Starting the Software Starting the Software Configuring the Project File Creating Project Files-PLC to DevicesApplication Description PLC Setup-Port DTU Address Communications SettingsWire RS422 or RS485 Communications PLC ProtocolResponse Time-Out Device Setup-PortSaving Port 1 Configuration Information Other Configuration InformationIntermessage Time-Out Passthrough Setup-PortSaving Port 2 Configuration Information Saving Port 3 Configuration InformationAdding a Device Device List SetupCreating Project Files-PLC to Devices Removing a Device Configuring Custom Device RegistersSaving the Device List Configuration Configuring Custom Registers for a Single DeviceCreating Project Files-PLC to Devices Configuring Default Custom Device Registers by Device Creating Project Files-PLC to Devices Device Text Setup 7SJ600 Only Description of Returned Trip Device Diagnostic Registers Global Command RegistersDevice Command Registers Saving the Project File Creating Project Files-Modbus Master to Devices Creating Project Files-Modbus Master to DevicesConfiguring the Project File Modbus Setup-Port RS-485 Connector two-wire Device Setup-Port Modbus Master Modbus/Passthrough Setup-PortPassthrough to Port 2 SEAbus With the 2-Wire RS422 or RS485 CommunicationsDevice List Setup Creating Project Files-Modbus Master to Devices Configuring Custom Device Registers Creating Project Files-Modbus Master to Devices Configuring Default Custom Device Registers Creating Project Files-Modbus Master to Devices Device Text Setup 7SJ600 Only Value Inputs 2 Global Command Registers Device Command Registers Creating Project Files-SEAbus Port Expander Creating Project Files-SEAbus Port ExpanderMenu, and the Port 1 Passthrough configuration Communications Settings Configuration Information SEAbus Device Setup-PortTransferring Project Files Transferring Project FilesDownloading Projects Personal Computer RS-232 Port