Chapter 2: Installation
Selecting a Site for the Chassis
Observe the following requirements when choosing a site for the chassis:
If you plan to install the chassis in an equipment rack, check to be sure that the rack is safely secured and that it will not tip over. Devices in a rack should be installed starting at the bottom, with the heavier devices near the bottom of the rack.
The chassis is heavy and requires two people to install it. For the weight and dimensions of the chassis, see “Physical Specifications” on page 101.
If you are installing the chassis on a table, be sure that the table is level and secure.
The power outlet for the chassis should be located near the unit and should be easily accessible.
The site should provide easy access to the ports both on the front and the rear of the chassis. This arrangement will make it easy for you to connect and disconnect cables as well as to view the LEDs.
To allow proper cooling of the chassis, air flow around the unit and through its vents should be unrestricted. Allow 8 inches around the rear of the chassis for proper airflow.
Do not place objects on top of the chassis.
Do not expose the chassis to moisture or water.
Make sure that the site is a
Use dedicated power circuits or power conditioners to supply reliable electrical power to the device.
44