Allied Telesis AT-CV5000 manual 256

Page 66

Chapter 2: Installation

A CVFAN-AT

A

 

 

WARNING

FOR CENTRALIZED DC POWER

 

 

This unit might have more than one power input. To

40-60VDC

reduce the risk of electric shock, disconnect all power

CONNECTION, INSTALL ONLY IN

 

 

inputs before servicing unit.

A RESTRICTED AREA.

 

 

AT-PWR15

 

 

 

 

POWER

 

 

 

 

FAULT

 

 

e

 

 

 

power

input.

 

isco

 

To

 

nnect all

 

 

 

power

W

 

 

 

 

B

 

B

 

 

 

WARNING

FOR CENTRALIZED DC POWER

 

AT

This unit might have more than one power input. To

 

reduce the risk of electric shock, disconnect all power

CONNECTION, INSTALL ONLY IN

40-60VDC

-

inputs before servicing unit.

A RESTRICTED AREA.

 

CVFAN

AT-PWR15

 

 

POWER

 

 

 

FAULT

 

 

 

256

PWR B

FOR

CEN

 

CO

 

 

 

NNE

C

 

A R

 

 

 

 

ESTR

R

 

 

 

A

IN

Figure 43. Inserting Wires into a DC Terminal Block

6.Connect the +48 VDC (RTN) feed wire to the terminal block marked + (plus).

7.Connect the -48 VDC feed wire to the terminal block marked - (minus).

Warning: Check to see if there are any exposed copper strands coming from the installed wires. When this installation is done correctly there should be no exposed copper wire strands extending from the terminal block. Any exposed wiring can con- duct harmful levels of electricity to persons touching the wires.

E12

8.Secure the tray cable near the rack framework using multiple cable ties to minimize the chance of the connections being disturbed by casual contact with the wiring. Use at least four cable ties, separated four inches apart. Locate the first one within six inches of the terminal block.

This system will work with a positive grounded or negative grounded DC system.  E13

9.Ensure that the circuit breaker is in the OFF position.

10.Connect the supply-cable wires to the circuit breaker.

11.Energize the circuit breaker.

12.Turn the power switch to the ON position.

If you installed an optional redundant power supply, repeat this procedure to attach DC wires to the second terminal block.

66

Image 66
Contents Installation Guide Page Electrical Safety and Emissions Standards Translated Safety Statements Contents Physical Specifications AT-CV5000 Media Converter Chassis Installation Guide Contents Figures Figures Tightening the Captive Screw Tables Tables Preface Safety Symbols Used in this Document Symbol Meaning DescriptionWhere to Find Web-based Guides Management Software Updates Contacting Allied TelesisOverview ChapterAT-CV5000 Overview AT-CV5000Hardware Features Software Features System DescriptionReset Button Front and Rear Panel ComponentsLED Interface Card Interface Card LEDs Reset LINE/ EXP Button AT-CV5M01 Management Card 10/100Base-TX Twisted Pair Port CPU Reset Button LEDsGreen Twisted pair port is operating in full Duplex mode Converteon Line Cards Link Test MissingLinkSmart MissingLink Line Card Port DescriptionsBlank Slot Covers Illustrates the AT-CV5PNLx Series blank slot coversPower Supplies Rear EXP. SlotFan Modules 201Management Connections MAC Address Table Duplex Mode Few Basics about Media ConvertersPass-through Network Topologies Standalone TopologyBack-to-Back Network Topology Overview Installation Reviewing Safety Precautions AT-CV5000 Media Converter Chassis Installation Guide Installation AT-CV5000 Media Converter Chassis Installation Guide Selecting a Site for the Chassis Unpacking the Chassis Inserting the Retaining Clip into the Retaining Bracket Retaining Clip Properly Installed in the Bracket Installing the AT-CV5000 Chassis in a Rack 236AT-CV5000 Media Converter Chassis Installation Guide Frame Ground Connectors Grounding the AT-CV5000 ChassisFrame ground stud for power supply a is shown in Figure Installing a Converteon Line Card Inserting a Line Card 249 Cabling a Converteon Line Card in an AT-CV5000 Chassis Cabling a Fiber Optic PortFiber Connector Cabling a Simplex SC Connector Cabling an SFP Transceiver Connecting Fiber Optic Cables to the SFP Transceiver Powering On an AC Powered Chassis VAC ~PWR a PWR B PWR a AT-CV5000 Media Converter Chassis Installation Guide Powering On a DC Powered Chassis DC Terminal Block8mm ±1mm 31in. ±0.039in 256 Connecting a Management Cable to the RS-232 Console Port Starting a Local Management SessionAT-S70 Main Menu AT-CV5000 Media Converter Chassis Installation Guide Starting a Remote Management Session Guideˆ Usernames and passwords are case-sensitive Installation Working with Line Cards and other Modules Removing a Converteon Line Card AT-CV5000 Media Converter Chassis Installation Guide Installing an Working with the AT-CV5M01 Management CardManagement Card Resetting an Replacing an Installing an AT-CM70S Line Card 907 Resetting Converteon Line Cards/Rear Expansion Module Installing an AT-PWR14 AC Power Supply AT-PWR14 Installing an AT-PWR15 DC Power Supply AT-PWR15 Replacing an AT-CVFAN Module Removing an AT-CVFAN Module from Fan Slot a Tightening the Screws on the AT-CVFAN Module in Slot a AT-CV5PWRAC Installing a Blank Slot Cover Blank Slot CoverAT-CM202 AT-CV5PNL2 AT-CV5PNL3 AT-PWR14 Troubleshooting Troubleshooting PWR LED is RDY LED is Blinking RDY LED is OFF FLT LED isFLT LED is Steadily on LK LED is OFF LK LED is Blinking LK LED is OFFAT-CV5000 Media Converter Chassis Installation Guide Troubleshooting 100 Power Specifications Physical SpecificationsEnvironmental Specifications Appendix aSafety and Electromagnetic Emissions Certifications StandardsPin Signal RJ-45 Twisted Pair Port PinoutsRS-232 Terminal Port Pinouts Illustrates the pin layout to an RS-232 terminal portPin Mini-DIN Console Port Pinouts SC Type Connectors Dual SC Connector Simplex SC ConnectorDual ST Type Connector Cable Dual ST Connector CableSFP Transceiver Cable SFP Transceiver CableCleaning Fiber Optic Connectors Appendix BUsing a Cartridge-Type Cleaner 111 Using a Swab Cleaning a Recessed Ferrule If desired, repeat step113 Appendix B Cleaning Fiber Optic Connectors 114