Chapter 3. Operation
TX PRM
Controls the sending of performance report messaging (PRM) data on the facility data link (FDL). The PRM data continues to be col- lected even if XMIT PRM is turned off (possible only with ESF for- mat). Choose either ON or OFF.
LBO
Write security: 2; Read security: 5
Selects the Line Build Out (LBO) for the network interface. The LBO setting determines the amplitude of the transmitted signal. For short haul
TEST
Write security: 3; Read security: 5
These options initiate different types of tests and display test results.
PRT
Displays the port number.
LOC LB
Write security: 4; Read security: 5
Causes loopback on
LINE | Metallic loopback |
PAYLD | Payload loopback - framing and |
| clocking are regenerated |
T1 Port
NI CSU
DS1
Payload Loopback
Line Loopback
| Figure |
IMUX MENUS | Read Security: 5 |
| Contains the inverse muxing configuration parameters for the NxT1 HSSI |
| Option Module. |
NxT1 HSSI/V.35 Module User Manual | 35 |