15.0Crimping and Boot Placement for 3 mm Jacketed Fiber
15.1Remove connector from load adapter
15.2Slide metal crimp sleeve down and over aramid yarn.
It should rest over the metal strength sheath as shown.
15.3Using the LC die labeled “A” with the 3M lettering facing left, crimp the left half of the the crimp ring once making sure that the 3M lettered side of the die is flush with the connector prior to crimping.
Note: The crimp ring must be flush against the connector prior to crimping. The
15.4Using the LC die labeled “B” line up the
The completed 3 mm crimp shold look like this:
Hex
16 |
|