Dell 760N, 720N, 740N manual +-0%$, #,,#6233

Page 41

￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿+￿￿￿￿￿￿￿￿￿￿￿￿-￿￿0￿￿￿￿￿%''$￿

￿￿￿￿￿￿￿￿￿￿￿￿￿￿

To connect the filer to a single PowerVault 700N storage system (or to as many as eight PowerVault 700N storage systems when cabled as a daisy-chain) you use the filer’s built-in FC-AL (DB-9) interface.

To connect a second or third loop of Fibre Channel PowerVault 700N storage systems to the 740N or 760N filer, you need an FC-AL adapter card installed in the filer for each additional loop. If you order the adapter after your initial order, you must install it yourself.

.￿#￿￿￿￿'￿￿￿￿￿￿￿￿￿￿￿,￿￿￿￿￿,￿￿￿￿￿'￿￿￿￿￿￿￿￿￿#￿￿6￿￿￿￿￿233"￿

￿￿￿￿￿￿￿￿￿￿￿￿￿￿

To connect the filer to the first PowerVault 700N storage system (in a single FC-AL loop), perform the following steps:

NOTE: This procedure assumes the PowerVault 700N storage system has been installed in the rack above or beneath the filer, following the installation instructions provided with the equipment.

1.Connect the FC-AL filer-to-PowerVault 700N storage system cable to the PRI con- nector on the link control card (LCC) back panel on the PowerVault 700N storage system (see Figure 2-8). Tighten the locking screws on the cable’s DB-9 connector.

For a daisy-chain configuration, make sure that the ID on the PowerVault 700N storage system connected to the filer is set to 0.

2.Route the cable through the cable management loop and then to the FC-AL0 con- nector on the back of the filer.

3.Install the free end of the cable’s DB-9 connector to the filer’s DB-9 socket con- nector, labeled FC-AL0. This first Fibre Channel loop is designated loop 0. This connector is located at the lower right corner of the filer’s back panel. Tighten the locking screws on the cable’s DB-9 connector.

Figure 2-8 shows the completed connections to the first PowerVault 700N storage system.

Installing a Filer System 2-11

Image 41
Contents Page Page Observe the following warnings while servicing this system 006 Vii Viii #$% #-%% #+%$ Page Xiii Xiv Monospaced font Xvi Xvii Xviii Xix Page Xxi Xxii $%$%*$+ Activity LED Status LED Power LED Nostic messages up to 32 characters Describes the back panel features 10/100Base-T Ethernet Disk-Array Enclosure DAE storage system with 18-GB #$!% Slot 9 dedicated to Nvram card $&# $%&#Introduction Page Installing a Filer System 145 +,+=1.75 inch DAA1% 24769!8 Shows the rack adapter rails properly positioned in the rack +6939 Page Installing a Filer System Select any two holes #,,#6233 +-0%$#./$&&# FC-AL1 loop FC-AL0 loop FC-AL adapter in slot $&$2 77% Installing a Filer System $!1 #,+Built-in Ethernet connector 33!# 13 shows the location of the Console port $&&# 14 shows two power suppliesAC LED Page 122# Shows the LEDs on the front panel +$ 1# Off-AC signal is not good #1&21 41&21 Quad-port Ethernet card #=# Troubleshooting the Filer Hardware 37# Startup failed Scsi Host Adapter 0b Administrator and Command Reference Storage enclosure address number. Setup Page Filer’s /etc/passwd and /etc/group Mode. Refer to the Dell PowerVault 720N This message appears in these situations Guide System Administrator and Command Ref Page Getting Help Ftp.dell.com Info@dell.com Support@us.dell.comSales@dell.com Page Getting Help Diagnostics Checklist 1344 Page Belgium AustraliaAustria Canada BruneiChile ChinaFrance DenmarkFinland Hong Kong GermanyIreland ItalyLatin America JapanKorea Macau LuxembourgMalaysia MexicoNew Zealand NetherlandsNorway PolandSouth Africa SingaporeSoutheast Asian Pacific CountriesSwitzerland SwedenTaiwan ThailandDell Home and Small Business Group Index Message FC-AL See also Dimms Index Nics Scsi
Related manuals
Manual 128 pages 1.69 Kb