Panasonic DMC-XS1PU, DMC-XS1GN, DMC-XS1GF manual Service Fixture & Tools, Service Fixture and Tools

Page 18

7 Service Fixture & Tools

7.1.Service Fixture and Tools

The following Service Fixture and tools are used for checking and servicing this unit.

7.2.When Replacing the Main P.C.B.

After replacing the Main P.C.B., be sure to achieve adjustment.

The service software is available at “TSN Website”.

18

Image 18
Contents Model No. DMC-XS1P Table of Contents Leakage Current Cold Check Safety PrecautionsGeneral Guidelines Leakage Current Hot Check See FigureHow to Discharge the E.Capacitor on Flash Top P.C.B Fig. F1How to Recycle the Lithium Ion Battery U.S. Only Service Navigation Introduction Important NoticeRecommended Lead Free Solder Service Parts Route General Description About Lead Free Solder PbFHow to Define the Model Suffix Ntsc or PAL model Defining methodsTemporary cancellation of Initial Settings Cancellation of Initial SettingsTurn the Power on Turn the Power on Display the Initial Setting Choose the model suffix in Initial Settings Refer to CautionDefault setting After Initial Settings ConfirmationSpecifications Location of Controls and Components Page How to display Service ModeError Code Memory Function Execute the error code display modeError Code List Important notice about Error Code List About * indication How to exit from Error Code display modeAbout ? indication 18*0 0?01 to 18*0 0?60 Service Fixture & Tools Service Fixture and ToolsWhen Replacing the Main P.C.B Service Position Disassembly and Assembly Instructions Disassembly Flow ChartP.C.B. Location Disassembly Procedure Removal of the Rear Case UnitRemoval of the Rear Op Plate Unit Fig. D2Removal of the Front Case Unit Removal of the LCD Unit Fig. D4Removal of the Frame Plate Removal of the Top Case UnitRemoval of the Main P.C.B. SpeakerFig. D12 Removal of the Battery Door Unit Fig. D13Removal of the CCD FPC Unit Fig. D14Introduction Measurements and AdjustmentsInitial Setting Release Before Disassembling the unitFlash-ROM Data Backup Rombackup Method of Non-PC backupLight Box Startup Electrical Adjustment mode Details of Electrical AdjustmentHow to execute the Electrical Adjustment Status Adjustment Flag SettingExecute Adjustment Case of OIS Adjustment Finalizing the AdjustmentAdjustment Specifications Page After Adjustment Initial SettingMaintenance Cleaning Lens and LCD PanelBlock Diagram Overall Block DiagramFlash / Top Block Diagram Sub Operation Block DiagramWiring Connection Diagram Interconnection Diagram