| PAGE | PAGE |
1 | Safety Precautions ----------------------------------------------- | 3 | |
| 1.1. General Guidelines ---------------------------------------- | 3 | |
| 1.2. Leakage Current Cold Check --------------------------- | 3 | |
| 1.3. Leakage Current Hot Check (See Figure. 1)-------- | 3 | |
| 1.4. How to Discharge the E.Capacitor on Flash | | |
| Top P.C.B. ---------------------------------------------------- | 4 | |
2 | Warning -------------------------------------------------------------- | 5 | |
| 2.1. Prevention of Electrostatic Discharge (ESD) | | |
| to Electrostatically Sensitive (ES) Devices ---------- | 5 | |
| 2.2. How to Recycle the Lithium Ion Battery (U.S. | | |
| Only)----------------------------------------------------------- | 5 | |
3 | Service Navigation------------------------------------------------ | 6 | |
| 3.1. Introduction -------------------------------------------------- | 6 | |
| 3.2. Important Notice ------------------------------------------- | 6 | |
| 3.3. General Description About Lead Free Solder | | |
| (PbF) ---------------------------------------------------------- | 7 | |
| 3.4. How to Define the Model Suffix (NTSC or PAL | | |
| model)--------------------------------------------------------- | 8 | |
4 | Specifications ---------------------------------------------------- | 12 | |
5 | Location of Controls and Components------------------ | 13 | |
6 | Service Mode ----------------------------------------------------- | 15 | |
| 6.1. Error Code Memory Function ------------------------- | 15 | |
7 | Service Fixture & Tools --------------------------------------- | 18 | |
| 7.1. Service Fixture and Tools ------------------------------ | 18 | |
| 7.2. When Replacing the Main P.C.B. -------------------- | 18 | |
| 7.3. Service Position ------------------------------------------ | 19 | |
8 | Disassembly and Assembly Instructions--------------- | 20 | |
| 8.1. Disassembly Flow Chart-------------------------------- | 20 | |
| 8.2. P.C.B. Location ------------------------------------------- | 20 | |
| 8.3. Disassembly Procedure -------------------------------- | 21 | |
| 8.4. Removal of the CCD FPC Unit ----------------------- | 28 | |
9 | Measurements and Adjustments -------------------------- | 29 | |
| 9.1. Introduction ------------------------------------------------ | 29 | |
| 9.2. Before Disassembling the unit ------------------------ | 29 | |
| 9.3. Details of Electrical Adjustment----------------------- | 31 | |
| 9.4. After Adjustment------------------------------------------ | 35 | |
10 | Maintenance ------------------------------------------------------ | 36 | |
| 10.1. Cleaning Lens and LCD Panel ----------------------- | 36 | |
11 | Block Diagram --------------------------------------------------- | 37 | |
| 11.1. Overall Block Diagram ---------------------------------- | 37 | |
| 11.2. Flash / Top Block Diagram ----------------------------- | 38 | |
| 11.3. Sub Operation Block Diagram ------------------------ | 38 | |
12 | Wiring Connection Diagram --------------------------------- | 39 | |
| 12.1. Interconnection Diagram ------------------------------- | 39 | |