3. Installation
3-2.Removal of the fixing bolts from the machine
The machine head and the sewing clamp arm are fixed with bolts to secure them during transportation.
q
Remove fixing bolt q on the machine head through the hole in the front cover.
Note:
¡Save removed fixing bolts q future use.
¡Before transporting the machine be sure to secure it with the fixing bolts.
3-3. Installation of the spool stand
Install the spool stand as shown in the illustration at left.
4 |