|
| 10. Adjustments |
|
|
|
|
|
|
| 1. | Loosen the four bolts w and adjust the height of the |
|
| stacker base q so that the workpieces stack neatly onto |
w |
| the stacker base q. |
t | 2. | Loosen the two bolts e, and then adjust the vertical |
|
| position of the stacker base q so that the workpieces |
|
| stack neatly onto the stacker base q. |
| 3. | Loosen the bolt r and adjust the height of the inner |
|
| work clamp bart. |
q | 4. | Loosen the bolt y and adjust the height of the outer |
|
work clamp baru.
e
u
y
r
34 |