Weider 831.153933 user manual

Page 16

39.Route the Leg Lever Cable (75) under a 4 1/2” Pulley (119). Attach the Pulley and a Large Cable Trap (121) to the indicated side of the Butterfly Upright (3) with a 3/8” x 3 3/4” Bolt (122), a 3/8” Washer (91), and a 3/8” Nylon Jamnut (113). Make sure that the Large Cable Trap is turned to hold the Cable in the groove of the Pulley.

40.Wrap the Leg Lever Cable (75) over a 3 1/2” Pulley

(78).Attach the Pulley to the Double “U”-bracket

(62)with a 3/8” x 1 3/4” Bolt (93) and a 3/8” Nylon Locknut (87).

41.Remove the preattached 3 1/2” Pulley (not shown) from the “U”-bracket (64).

Attach the end of the Leg Lever Cable (75) to the “U”-bracket (64) with a 1/4” Washer (97) and a 1/4” Nylon Locknut (34). Note: Do not completely tighten the Locknut; it should be threaded onto the end of the Cable so that two threads show past the Locknut (see inset drawing).

42.Locate the Swivel Low Cable (72), which is the only remaining cable that has an eyelet on one end and a ball on the other end. Route the eyelet end of the Cable through the cage on the Long Base (120) and through the Swivel Upright (5) as shown.

Attach a 3 1/2” Pulley (78) to the indicated bracket on the Long Base (120) with 3/8” x 1 3/4” Bolt (93) and a 3/8” Nylon Locknut (87).

43.Wrap the Swivel Low Cable (72) under a 3 1/2” Pulley (78). Attach the Pulley to the indicated brack- et on the Long Base (120) with a 3/8” x 1 3/4” Bolt (93) and a 3/8” Nylon Locknut (87).

16

39

 

 

 

119

 

122

 

 

121

 

 

 

3

 

 

75

 

 

91

113

40

 

 

 

93

 

 

87

 

 

62

 

 

75

 

 

78

 

41

 

 

75

 

75

64

 

97

 

 

34

 

 

 

 

34

42

 

 

78

 

 

72

 

 

Cage

87

 

 

 

120

5

 

93

 

43

 

 

 

72

 

78

 

 

120

87

 

93

 

 

 

Image 16
Contents Model No Serial No Sears, Roebuck and Co., Hoffman Estates, ILTable of Contents Important Precautions DecalBefore YOU Begin One on each sideAssembly Frame Assembly Locknut the Squat Knee Rest must be able to pivotLocknuts yet Do not tighten the Nylon Locknuts yetPage Assemble the other weight stack in the same way Open the parts bag labeled ARM Assembly Do not tighten the Locknuts yetCable Assembly Repeat this step with the Left Butterfly ArmTrap is turned to hold the Cable in the groove of the Pulley 100 68 78 101 102 Page Page Page Page Seat Assembly Locate and open the parts bag labeled Seat AssemblyNylon Locknuts yet Repeat this step with the other end of the Squat ArmTighten all of the 3/8 Nylon Locknuts 87 used in this step Page Adjustments Ing any exerciseAdjusting the Squat ARM or Swivel Carriage Weight Resistance Chart StationTroubleshooting Tightening the CablesLat Cable Cable DiagramsButterfly Cable Swivel High Cable Squat Cable Swivel Cable Leg LeverSwivel Low Part Identification CHART-Model No R1003APage Page Part LIST-Model No Key Qty DescriptionExploded DRAWING-Model No Full 90-DAY Warranty Sears, Roebuck and Co., Dept 817WA, Hoffman Estates, IL