53.Wrap the Squat Cable (73) under a 3 1/2” Pulley
(78).Attach the Pulley and a Cable Trap to the sec- ond set of holes from the top in the indicated brack- et on the Long Base (120) with a 3/8” x 2” Bolt
(100)and a 3/8” Nylon Locknut (87). Make sure that the Cable Trap is turned to hold the Cable in the groove of the Pulley.
54.Wrap the Squat Cable (73) over a 4 1/2” Pulley (119). Attach the Pulley to the indicated bracket on the Top Frame (6) with a 3/8” x 1 3/4” Bolt (93) and a 3/8” Nylon Locknut (87).
55.Place a 1/2” Washer (1) on top of the Weight Tube
(43)closest to the Squat Upright (4). Tighten a 1/2” Nut (118) halfway onto the end of the Squat Cable
Lift the Weight Tube (43) and the Top Weight (45) and make sure that the small pin on the Weight Tube is inside of the groove under the Top Weight.
Hold the Weight Tube (43) and the Top Weight (45) a few inches over the weight stack and insert the Weight Pin (50). Screw the end of the Cable (73) two full turns into the Weight Tube. Then, tighten the Nut against the 1/2” Washer (1). Remove the Weight Pin and set the Top Weight back on the weight stack. Replace the Pin.
SEAT ASSEMBLY
56.Locate and open the parts bag labeled “SEAT ASSEMBLY.”
Insert the Pad Tube (23) into the square hole in the Seat Upright (9). Slide the two Knee Pads (19) onto the Pad Tube as shown. Press the two Knee Pad Caps (109) into the ends of the Pad Tube.
Slide two Short Pads (20) onto the Leg Lever (10).
19
53 |
|
|
|
|
|
| 73 |
| 78 |
|
| 68 |
| |
|
|
|
| |
|
|
|
| 87 |
| 100 | 120 |
|
|
54 |
|
|
|
|
|
| 6 | 87 | |
|
|
|
| |
|
| 93 |
|
|
|
|
|
| 119 |
|
|
|
| 73 |
55 |
|
|
| 4 |
|
|
|
| |
|
| 73 |
|
|
|
| 118 |
|
|
|
| 1 |
| 45 |
|
|
|
| |
|
| 43 |
|
|
|
|
|
| 50 |
56 | 19 |
|
|
|
|
|
|
| |
109 |
| 23 |
|
|
|
|
|
| |
|
| 9 |
| 19 |
| 20 |
|
|
|
|
| 10 |
| 109 |
|
|
|
| |
|
|
| 20 |