Cabletron Systems EMM-E6 manual Environmental Requirements, Certification, COM Port Pinout

Page 50

Appendix A: Specifications

A.3 ENVIRONMENTAL REQUIREMENTS

Operating Temperature: 5°C to 40°C (41°F to 104°F)

Storage Temperature:

-30°C to 90°C (-22°F to 194°F)

Operating Humidity:

5% to 95% (non-condensing)

A.4 CERTIFICATION

Safety:

UL 1950, CSA C22.2 No. 950, EN 60950, and

 

IEC 950

Emission:

FCC Part 15 Class A, VCCI Class I, and

 

EN 55022 Class A

Immunity:

EN 50082-1

This unit has been tested by Bellcore and found to comply with the following Bellcore standards:

TR-NWT-000063

Network Equipment Building System (NEBS)

 

Generic Equipment Requirements

GR-1098-CORE

EMC and Electrical Safety Generic Criteria for

 

Network Telecommunications Equipment

A.5 COM PORT PINOUT

Type: Standard RJ45 port

Pin

Function

Connection Attitude

 

 

 

 

 

 

1

Transmit Data (XMT)

From COM 2 port

 

 

 

2

Data Carrier Detect (DCD)

From COM 2 port

 

 

 

3

Data Set Ready (DSR)

To COM 2 port

 

 

 

4

Receive Data (RCV)

To COM 2 port

 

 

 

5

Signal Ground (GND)

NA

 

 

 

6

Data Terminal Ready (DTR)

From COM 2 port

 

 

 

7

Request to Send (RTS)

To COM 2 port

 

 

 

8

Clear to Send (CTS)

NA

 

 

 

A-2

EMM-E6 Installation Guide

Image 50
Contents Management Module Installation Guide EMM-E6 Ethernet BridgePage EMM-E6 Installation Guide DOC Notice Cabletron Software Program License Declaration of Conformity Contents Adding Epims EMM-E6 Overview HOW to USE this ManualChapter Introduction Introduction Document Conventions Following conventions are used throughout this documentRelated Documents Getting HelpChapter Controls and Indicators FaceplateInternal Components Internal Components Epim Connector Pins Ldram Simm Slot Reset CPU B a Stby RCV XMT CLN Lanview LedsLanview Leds EMM-E6 Installation Guide Chapter Installation Unpacking the EMM-E6Perform a second visual inspection of the module Setting Mode Switches EMM-E6 Dip SwitchesEMM-E6 Installation Guide PRE-INSTALLATION Test Pre-Installation Test Configuration Installation Install the EMM-E6 into the MMAC-FNB backplane as followsModule Guide Channels Reset CPU B a Stby RCV XMT CLN Connecting to the Network Connecting a 10BASE-T Segment to an EPIM-TPosition X crossed over RX+ TX+ Position = Not crossed over Cable Pinouts RJ45 Port Connecting a 10BASE-F Segment to an EPIM-F2 or EPIM-F3 ST Connector Insertion Connecting a 10BASE-F Segment to an EPIM-F1 SMA Connector Insertion Connecting an AUI Segment to an EPIM-X or EPIM-AConnecting a 10BASE2 Segment to an EPIM-C 10 BNC Connector Insertion Backplane Test 11 Backplane Test ConfigurationChapter Troubleshooting Using Lanview LedsTroubleshooting Using Lanview Leds Troubleshooting Checklist Troubleshooting Checklist EPIM-A Using the Reset Switch EMM-E6 Installation Guide Operating Specifications Appendix a SpecificationsPhysical Specifications COM Port Pinout Environmental RequirementsCertification Locating Brim Connectors Appendix B Upgrading the EMM-E6To install an EPIM, perform the following steps Adding EpimsSimm Upgrades Locating SIMMsInstalling SIMMs Figure B-3, refer to the procedures below1 10BASE-T Twisted Pair Network Appendix C Ethernet Cabling RequirementsNetwork Requirements Appendix C Ethernet Cabling Requirements Multimode Fiber Optic Network Single Mode Fiber Optic Network 4 10BASE2 Coaxial Cable Network Transceiver RequirementsEMM-E6 Installation Guide Index NumericsIndex-2 EMM-E6 Installation Guide EMM-E6 Lanview LEDsInstallation
Related manuals
Manual 118 pages 2.72 Kb