Liebert
510 616 830, 205 251, 104 165, 308 415, 1010
manual
System Maintenance
Troubleshooting
Install
Line Voltage Wiring
Dimension
Maintenance
Typical System Configurations
Operation and component access
General Procedures
Checklist
Condenser Cleaning
Page 41
System Maintenance
NOTES
37
Page 40
Page 42
Image 41
Page 40
Page 42
Contents
Liebert Air Cooled, Direct Drive Condensers
Example DCDF165-Y
Three-phase voltage is only voltage available as standard
On condensers with VFD Control, Lee-temp receivers,
Fan Speed Control 2-8 fan models only
Table of Contents
Operation
System Maintenance
Head Pressure Control Types
Product Description and Features
Fan Speed
Variable Frequency Drive
Transient Voltage Surge Suppression Option
Typical System Configurations
Sound Level Options
Lee-Temp Discharge
Fan Speed and VFD
Site Considerations
Dimensions and Weights
1067 mm
See for typical condenser footprint dimensions
Four-Fan41-3/16 Condenser 1046mm
See for typical
Operation and component access
Condenser footprint dimensions
Typical condenser footprint-dimensions
Piping connections for 6- and 8-fan Fan Speed Condensers
Site Preparation
Quiet-Line Models
Condenser physical data
R-407C refrigerant required, approximate
Refrigerant Planning Values
Receiver
Quiet-Line Condenser Models
Packing Material
Equipment Inspection
Unpacking the Unit
Handling Unit on the Skid
Removing the Skid and Attaching Slings
Step
Attaching legs to a 6-fan or 8-fan unit
Attaching sling to a 6-fan or 8-fan unit for moving
Mounting the Condenser
Electrical Supply Preparation
Line Voltage Wiring
50Hz condenser full load amp values
60Hz condenser data
Low Voltage Monitoring Wiring-TCDV Only
Low Voltage Control Wiring
Electrical Connections
Lee-Temp receiver electrical data, 50Hz and 60Hz
VFD Control Condensers Tcdv only
Wye-Connected Power Supply
Delta-Connected Power Supply
Disconnect EMC Filter for Delta-Connected Power
Electrical Field Connection Descriptions
Electric service connection and fuse block
Electrical field connections for VFD control condensers
Inspection and Installation
Piping Guidelines
Refrigeration Piping Connections
VFD and Fan Speed Control condenser piping
Field Piping Installation
Lee-Temp head pressure control condenser piping
General arrangement-Air cooled models with Lee-Temp control
Single Circuit Shown
System Dehydration/Leak Test and Charging Procedures
Electrical
Moving and Placing Equipment
Piping
Other
Startup
Startup Checklist
System Maintenance
General Procedures
Condenser Cleaning
Special Procedures
When to Clean
How to Clean
Monthly Semiannually Condenser
Maintenance Inspection Checklist
Condenser Electrical Panel Condenser Electric Panel
Fan Motors
Symptom Possible Cause Check or Remedy
Troubleshooting
System Maintenance
System Maintenance
Page
Iti
Ne t
Ti n
That
Related pages
All Maintenance page
Cleaning and Maintenance for Smeg A42-6
Maintenance for Skil 6265
Care and Maintenance for Avanti OR2700SS
Cleaning and Maintenance for Smeg SE2641NO
Maintenance for Snapper P216012TV, FRP216012TV, EFRP216012TV, EFRP216512TV, EFRP216516TV
Satellite P20-25 Series Maintenance Manual for Toshiba P25
Maintenance and Lubrication for Braun NUVL855RM24
Maintenance of Stereo Cassette Mechanism for Viking MCX-106
Maintenance for Panasonic CQ-4500U
What are the different training zones in the
Polar M400
manual?
Top
Page
Image
Contents