Checklist for Completed Installation
4.0CHECKLIST FOR COMPLETED INSTALLATION
4.1Moving and Placing Equipment
___ 1. Unpack and check received material
___ 2. Proper clearance for service access has been maintained around the equipment
___ 3. Equipment is level and mounting fasteners are tight
4.2Electrical
___ 1. Line voltage connected and matches equipment nameplate
___ 2. Power line circuit breakers or fuses have proper ratings for equipment installed
___ 3. Control wiring connections completed between indoor cooling unit and condenser
___ 4. All internal and external high and low voltage wiring connections are tight
___ 5. TCDV condensers
___ 6. Monitoring wiring connections completed, when equipped, to indoor cooling unit or external monitoring panel
___ 7. Confirm that unit is properly grounded to an earth ground
___ 8. Control transformer setting matches incoming power
___ 9. Electrical service conforms to national and local codes
___ 10. Check fans for proper phase rotation. Blades should rotate clockwise when viewing the unit from the fan guard side.
4.3Piping
___ 1. Piping is completed to corresponding indoor cooling unit refrigeration circuit.
___ 2. Piping
___ 3. Piping is properly sized, sloped and trapped for proper oil return.
___ 4. Piping is routed to reduce potential of
4.4Other
___ 1. Fans rotate freely and in proper direction
___ 2. Adjust ambient thermostat setpoints to match setpoints on the electrical schematic supplied with the condenser.
___ 3. Foreign material removed from in and around all equipment installed (construction materials, construction debris, etc.).
___ 4. Installation materials and tools have been removed from in and around all equipment (literature, shipping materials, tools, etc.).
___ 5. Blank
31