Intel II Installing the Front Cover, Installing the Hot-swap Bay, Installing an Add-in Board

Page 33

Installing the Front Cover

1.￿Insert the plastic tabs on the front cover into the slots on the right of the chassis. Squeeze the front panel and chassis together along the left side until the plastic tabs snap into their slots.

Installing the Hot-swap Bay

1.Tilt the bay into the chassis.

2.Connect the power and data cables to the SCSI backplane.

3.Install and tighten the three screws holding the bay to the chassis.

4.￿Install the side cover.

Installing an Add-in Board

CAUTIONS

Do not overload the server board by installing add-in boards that draw excessive current.

Add-in boards can be extremely sensitive to ESD and always require careful handling. After removing the board from its protective wrapper or from the server board, place it component side up on a grounded, static free surface or conductive foam pad—if available. Do not slide the board over any surface.

1.Remove side cover.

2.Remove and save the expansion slot screw and cover.

3.Remove add-in board from its protective wrapper. Be careful not to touch the components or gold edge connectors. Place board component side up on an antistatic surface.

4.Record the type and serial number of the add-in board in your equipment log.

5.Set jumpers or switches according to the manufacturer’s instructions.

6.￿Hold board by its top edge or upper corners. Firmly press it into an expansion slot on the server board. The tapered foot of the board retaining bracket must fit into the mating slot in the expansion slot frame.

￿￿Install an ISA board component side UP. Install a PCI board component side DOWN.

7.Align the rounded notch in the retaining bracket with the threaded hole in the frame. The bracket fits the space that was occupied by the slot cover.

8.Use the screw removed earlier. Insert it into the threaded hole, and push the rounded notch against the screw. Tighten it firmly to prevent the bracket from interfering with adjacent brackets. Attach cables if necessary.

9.￿Reinstall the side cover.

Working Inside the System

33

Image 33
Contents Intel Astor II Server Chassis Subassembly Product Guide FCC Declaration of Conformity Contents Technical Reference Regulatory InformationEquipment Log and Worksheets Figures WarrantyTables Feature Summary Kit ContentsFront Controls and Indicators Chassis Front Controls and IndicatorsBack I/O Ports and Features Chassis Back I/O Ports and FeaturesChassis Side View Chassis Side ViewExternal Bay for 5.25-inch Removable Media Devices PeripheralsInternal Bay for 3.5-inch IDE Hard Drives Hot-swap BayPower Supply Checking the Power CordSystem Cooling System Security Mechanical LocksMonitoring Intel Astor II Server Chassis Subassembly Product Guide Tools and Supplies Needed Safety Before You Remove the Side CoverRemoving the Side Cover Removing the Side Cover Installing Chassis FeetRemoving the Hot-swap Bay Removing the Hot-swap BayDisconnect Cables and Remove Screws Removing the IDE Drive BayIDE Hard Drive Bay Rubber Bumper and Standoff Clip Placement Installing Server Board Clips and BumpersShield Installing the Server BoardInstalling the Server Board typical board shown Installing a Chassis Intrusion Switch Installing a Chassis Intrusion SwitchRemoving the Front Cover Removing the Front CoverRemoving the Diskette Drive Installing the Diskette DriveHard Drives Installing a Hard Drive into the IDE drive bayDrive Cabling Considerations IDE RequirementsIDE Hard Drive Removing a Hard Drive from the IDE Drive BayInstalling the IDE Drive Bay Remove Filler Panels and EMI Shields Installing a 5.25-inch Peripheral DeviceSnap-in Plastic Slide Rails Removing a 5.25-inch Peripheral Device Installing a Removable Media DeviceInstalling the Front Cover Installing the Hot-swap BayInstalling an Add-in Board Removing an Add-in Board Installing an Add-in BoardInstalling the Side Cover Hot-swap Bay Scsi Hard Disk DrivesMounting a Scsi SCA2 Hard Disk Drive in a Plastic Carrier Hard Disk Drive and Plastic Carrier Installing a Scsi SCA2 Hard Disk Drive in the Hot-swap BayHot-swapping a Scsi SCA2 Hard Disk Drive Installing a Hard Disk DriveFan Cable Connector Pinout FansRemoving the Front Fan Installing the Front Fan Installing the Front FanRemoving a Hot-swap Bay Fan Installing a Hot-swap Bay FanRemoving the Scsi Backplane Hot-swap BackplaneRemoving the Scsi Backplane Installing the Scsi BackplaneInstalling the Front Panel Board Front Panel BoardRemoving the Front Panel Board Power Supply Output Voltages Power Supply SpecificationsInput Voltages Output VoltagesEnvironmental Specifications Environmental SpecificationsScsi Hot-swap Backplane Connectors Ultra2/LVD Scsi 16-Bit ConnectorWide/Fast Scsi 16-Bit Connector Pinout Wide/Fast SCA2 Scsi 16-Bit Connector Pinout Ultra2/LVD SCA2 Scsi 16-Bit ConnectorsBackplane Fan Connector Power ConnectorsPower Connector Pinout Backplane Fan Connector PinoutFront Panel Connector Pinout Front Panel Cable ConnectorRegulatory Compliance Safety ComplianceEMC Compliance Regulatory Compliance Markings Electromagnetic Compatibility Notice USAFCC Declaration of Conformity Electromagnetic Compatibility Notices InternationalVarning Installation Safety InstructionsBe UL Listed Use Only for Intended ApplicationsEquipment Log Equipment Log and WorksheetsEquipment Log Worksheet, Calculating DC Power Usage Calculating Power UsagePower Usage Worksheet Current UsageWorksheet, Total Combined Power Used by the System Page Astor II Chassis Subassembly Product Guide Page Avertissement Français Avertissement Français suite Warnung Deutsch Warnung Deutsch Fortsetzung Avvertenza Italiano Avvertenza Italiano continua Advertencias Español Advertencias Españolcontinúa Astor II Chassis Subassembly Product Guide Extent of Limited Warranty WarrantyLimitations of Liability Warranty Limitations and ExclusionsTelephone Support How to Obtain Warranty ServiceReturning a Defective Product