Intel II manual Installing a Chassis Intrusion Switch

Page 24

Installing a Chassis Intrusion Switch

Your server board probably has a chassis intrusion connector on it. However, we recommend that you attach the chassis intrusion switch to the front panel.

1.Remove the side cover.

2.Remove the IDE drive bay.

3.Remove the hot-swap bay.

4.Position the switch so the screw hole lines up with the hole in the chassis.

5.Insert and tighten the screw.

6.￿There are three small holes in the sheet metal, two on the back and one in the top. Attach two of the plastic clips to the cable and route it along the back of the chassis. Insert the plastic clips into the holes along the back of the chassis. Attach the third clip to the cable and route the cable between the power supply and the IDE bay. Insert the third clip into the hole in the top sheet metal. Route the cable behind the 5.25-inch drive bay.

7.￿Connect the chassis intrusion switch cable to the front panel.

OM08475

Figure 12. Installing a Chassis Intrusion Switch

24

Intel Astor II Server Chassis Subassembly Product Guide

Image 24
Contents Intel Astor II Server Chassis Subassembly Product Guide FCC Declaration of Conformity Contents Technical Reference Regulatory InformationEquipment Log and Worksheets Warranty FiguresTables Kit Contents Feature SummaryChassis Front Controls and Indicators Front Controls and IndicatorsChassis Back I/O Ports and Features Back I/O Ports and FeaturesChassis Side View Chassis Side ViewPeripherals External Bay for 5.25-inch Removable Media DevicesInternal Bay for 3.5-inch IDE Hard Drives Hot-swap BayPower Supply Checking the Power CordSystem Cooling System Security Mechanical LocksMonitoring Intel Astor II Server Chassis Subassembly Product Guide Safety Before You Remove the Side Cover Tools and Supplies NeededRemoving the Side Cover Installing Chassis Feet Removing the Side CoverRemoving the Hot-swap Bay Removing the Hot-swap BayRemoving the IDE Drive Bay Disconnect Cables and Remove ScrewsIDE Hard Drive Bay Installing Server Board Clips and Bumpers Rubber Bumper and Standoff Clip PlacementInstalling the Server Board ShieldInstalling the Server Board typical board shown Installing a Chassis Intrusion Switch Installing a Chassis Intrusion SwitchRemoving the Front Cover Removing the Front CoverInstalling the Diskette Drive Removing the Diskette DriveInstalling a Hard Drive into the IDE drive bay Hard DrivesDrive Cabling Considerations IDE RequirementsRemoving a Hard Drive from the IDE Drive Bay IDE Hard DriveInstalling the IDE Drive Bay Installing a 5.25-inch Peripheral Device Remove Filler Panels and EMI ShieldsSnap-in Plastic Slide Rails Installing a Removable Media Device Removing a 5.25-inch Peripheral DeviceInstalling the Front Cover Installing the Hot-swap BayInstalling an Add-in Board Installing an Add-in Board Removing an Add-in BoardInstalling the Side Cover Hot-swap Bay Scsi Hard Disk DrivesMounting a Scsi SCA2 Hard Disk Drive in a Plastic Carrier Installing a Scsi SCA2 Hard Disk Drive in the Hot-swap Bay Hard Disk Drive and Plastic CarrierInstalling a Hard Disk Drive Hot-swapping a Scsi SCA2 Hard Disk DriveFan Cable Connector Pinout FansRemoving the Front Fan Installing the Front Fan Installing the Front FanInstalling a Hot-swap Bay Fan Removing a Hot-swap Bay FanHot-swap Backplane Removing the Scsi BackplaneInstalling the Scsi Backplane Removing the Scsi BackplaneInstalling the Front Panel Board Front Panel BoardRemoving the Front Panel Board Power Supply Specifications Power Supply Output VoltagesInput Voltages Output VoltagesEnvironmental Specifications Environmental SpecificationsScsi Hot-swap Backplane Connectors Ultra2/LVD Scsi 16-Bit ConnectorWide/Fast Scsi 16-Bit Connector Pinout Ultra2/LVD SCA2 Scsi 16-Bit Connectors Wide/Fast SCA2 Scsi 16-Bit Connector PinoutPower Connectors Backplane Fan ConnectorPower Connector Pinout Backplane Fan Connector PinoutFront Panel Cable Connector Front Panel Connector PinoutSafety Compliance Regulatory ComplianceEMC Compliance Electromagnetic Compatibility Notice USA Regulatory Compliance MarkingsElectromagnetic Compatibility Notices International FCC Declaration of ConformityInstallation Safety Instructions VarningUse Only for Intended Applications Be UL ListedEquipment Log and Worksheets Equipment LogEquipment Log Calculating Power Usage Worksheet, Calculating DC Power UsagePower Usage Worksheet Current UsageWorksheet, Total Combined Power Used by the System Page Astor II Chassis Subassembly Product Guide Page Avertissement Français Avertissement Français suite Warnung Deutsch Warnung Deutsch Fortsetzung Avvertenza Italiano Avvertenza Italiano continua Advertencias Español Advertencias Españolcontinúa Astor II Chassis Subassembly Product Guide Warranty Extent of Limited WarrantyWarranty Limitations and Exclusions Limitations of LiabilityHow to Obtain Warranty Service Telephone SupportReturning a Defective Product