Xantrex Technology TS400 manual Resetting After a Fault or Shutdown, Dxow 6WDWXV $FWLRQ

Page 53

Resetting After a Fault or Shutdown

Resetting After a Fault or Shutdown

This section provides explanations and procedures for resetting the TS400 after a fault or shutdown.

If you are unable to resolve the problem after referring to Table 3-3, refer to the “Troubleshooting” section on page 4–2.

Table 3-3Resetting After a Fault or Shutdown

)DXOW

6WDWXV

$FWLRQ

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Shutdown

The TS400 needs to be reset.

Turn the On/Standby switch on either the

 

 

inverter’s front panel or the optional S400

 

 

Remote Switch to Standby (

 

 

) and then to

 

 

 

 

 

 

 

 

On (

 

 

).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Short Circuit

If there is a short circuit, the

Remove the short circuit condition then press

 

Supplemental Circuit

the Supplemental Circuit Protection button.

 

Protection button trips.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ground Fault

When a fault condition is

Reset: To resume normal operation, determine

 

detected, the Reset button on

and correct the ground fault, then press the

 

the GFCI outlet trips and

Reset button.

 

 

 

 

 

power to the appliance is

Test: Press the Test button on the GFCI outlet

 

interrupted.

with the TS400 turned to On (

 

). The Reset

 

 

 

 

 

 

button should trip. Press the Reset button to

 

 

reset the GFCI and continue with normal

 

 

operation. This test should be performed on a

 

 

monthly basis.

 

 

 

 

 

 

If the Reset button does not trip, the GFCI may

 

 

have failed. Contact your dealer to have a

 

 

qualified service person examine the TS400.

 

 

 

 

 

 

 

 

 

 

 

Overload

The TS400 is designed to

Disconnect the equipment connected to the

 

provide 400 watts continuously

inverter and then turn the On/Standby switch

 

and 800 watts surge capability

on either the inverter’s front panel or the S400

 

for five seconds. If the

Remote Switch to Standby (

 

 

) and then to

 

 

 

 

 

 

 

connected equipment draws

On (

 

).

 

 

 

 

 

 

 

 

 

 

 

more than the rated power, the

 

 

 

 

 

 

 

 

 

 

TS400 will shut down and the

See also “Recharging Your Batteries” on

 

red Fault light illuminates.

page 3–5.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

975-0055-01-01

3–7

Image 53
Contents TS400 Sine Wave Inverter Page TS400 Sine Wave Inverter DWHDQG5HYLVLRQ Scope PurposeAudience OrganizationConventions Used Related Information Acronyms and TerminologyPage General Precautions Important Safety InstructionsExplosive Gas Precautions Precautions When Working With BatteriesFCC Information to the User Page Contents Specifications TroubleshootingBattery Types and Sizes Operation975-0055-01-01 Xiii Xiv Introduction How TS400 Works Premium Power and Ease of Use7KLVSURWHFWLRQIHDWXUH« Comprehensive ProtectionHdwxuh Hvfulswlrq TS400 FeaturesFront Panel Hvfulswlrq Back PanelPart number of Remote Switch Optional Accessory Remote SwitchDimensions of Remote Switch Installation Inverter IntroductionInstallation Codes Preparing for InstallationMaterials List Installation Tools and MaterialsMaterials for AC output hardwiring Overview Installing the TS400Designing Your Installation Choosing a Location Battery Requirements Hdfkfdeoh DC CablesTo mount your TS400 Mounting Your InverterTo connect the chassis ground Connecting the Chassis GroundTo install the remote switch Installing the Optional S400 Remote Switch3Connecting Cable to the TS400 To prepare the DC cables Getting Ready to Connect the DC CablesGuidelines for Routing the DC Cables Routing the DC Cables5Connection Order for DC Cables Connecting the DC CablesTo connect the DC cables To connect your AC equipment to the Gfci outlets Connecting Your Equipment to the Gfci OutletsTo hardwire the AC output connections Hardwiring the AC Output7Removing the 3 Screws on the Wiring Box Access Panel 8Completing the Hardwiring To test the TS400 Testing Your InstallationPerforming Checks Prior to Initial Start-up 9Inverter Dimensions 10S400 Remote Switch Mounting Template Scale approximately Operation Panel of the TS400 on page 1-4 in the Introduction chapter Front Panel FeaturesOperating the TS400 Turning the TS400 to Standby When Not in UseTurning the TS400 On To turn the TS400 on2S400 Remote Switch Using the Optional S400 Remote SwitchTo recover from a low battery voltage shutdown Recovering from Low Battery Voltage ShutdownRecharging Your Batteries Restarting or Operating Multiple Pieces of EquipmentLjkw Roru 6WDWXV $FWLRQ Monitoring the Operating StatusDxow 6WDWXV $FWLRQ Resetting After a Fault or ShutdownPage Troubleshooting Front Panel Troubleshooting Reference3UREOHP 3RVVLEOH&DXVH 1Troubleshooting Reference3UREOHP 3RVVLEOH&DXVH 6ROXWLRQ Specifications Physical Specifications with Projections Electrical SpecificationsFan Cooling System Regulatory ApprovalsPage Battery Types and Sizes Deep-Cycle Batteries Battery TypesAutomotive Starting Batteries Battery Size Battery Sizing Example Estimating Battery RequirementsTo determine how much battery capacity you need 7LPHSHUD\ Dssoldqfh $SSOLDQFH Dwwv +RXUVBattery Sizing Worksheet Two Batteries Connected In Parallel Using Multiple BatteriesTwo Separate Battery Banks Battery Tips 6WDWHRI&KDUJH Warranty Warranty and Product InformationExclusions DisclaimerProduct Out of Warranty Service Return Material Authorization PolicyReturn Procedure Information About Your System Information About Your SystemIndex IX-2 975-0055-01-01 IX-3 IX-4 Page Xantrex Technology Inc