Xantrex Technology
Freedom SW 2000
user service
Install
AC Wiring
Battery
Testing in Invert Mode
DC Connection Precautions
Safety
Page 14
Page 13
Page 15
Image 14
Page 13
Page 15
Contents
Freedom SW Sine Wave Inverter/Charger
Page
This guide for use by qualified installers only
About This Guide
Statement of Hazard
Related Information
Important Safety Instructions
Electrical Shock Hazard
Fire and Burn Hazard
Explosion Hazard
Precautions When Working With Batteries
Risk of Damage to the INVERTER/CHARGER
Precautions When Preparing to Charge
Exposure to Chemicals and Gases Hazard
Regulatory
Limitations on USE
Contents
Page
Cabling and Hook-up Configurations
Page
Introduction
Materials List
Materials List
Installation Codes
Installation Information
Before You Begin the Installation
Electrical Shock and Fire Hazards
Size and Length of DC Cables
Planning the Installation
Two Key Performance Factors
Mounting Location of the Freedom SW
AC and DC Components including wire and breaker sizes
Sample Vehicle Electrical System Configuration
For wire and breaker size information
AC Output
AC Components
AC Input
AC Loads
Gfci Requirements
Distribution Panels
AC Output Protection
Tested GFCIs
AC Wiring
AC Output Neutral Bonding
DC Disconnects and Over-Current Devices
DC Components
Batteries
DC Cabling
DC Grounding
Heavy Load
Materials
Installation Tools and Materials
Tools
Installing the Inverter/Charger
Overview
Heat Hazard
Choosing a Location for the Inverter/Charger
Fire and Explosion Hazard
Safe
Battery
Battery acid
Close to
To mount the inverter/charger
Mounting the Inverter/Charger
Considerations
Approved Mounting Orientation Orientation? Comment
Approved Mounting Orientation Orientation?
FIRE, Electrical SHOCK, and Energy Hazards
Connecting the AC Input and AC Output Wires
General AC Wiring Considerations
Damage other equipment
Connecting AC Input Wires
Equipment Damage
To make the AC input connections
Connecting AC Output Wires
Output AC Wire Size
Preparing the Cables
Connecting the DC Cables
DC Connection Precautions
To prepare the DC cables
Guidelines for Routing the DC Cables
Electrical Shock and Fire Hazard
Equipment Damage DUE to Reverse Polarity
Connecting the DC Cables to the Inverter/Charger
Fire Hazard
DC Terminal Covers
2000
To connect the chassis ground
Connecting the Battery Temperature Sensor BTS
Mounting Options
Mounting to the Negative Battery Terminal
To mount the sensor on the negative battery terminal
Connecting the BTS Cable to BTS Jack
Mounting to the Side of the Battery Case
To mount the sensor on the battery case
Performing Checks Prior to Initial Start-Up
Testing Your Installation
Testing in Invert Mode
Testing in Charge Mode
Installation Complete
Inverter/Charger Physical Specifications
Calculating Battery Size
Battery Information
Battery Bank Sizing
Calculate Battery Size
Battery Information
Restrictions on Motor Size
Battery Banks
Battery Bank Sizing Worksheet
= Total watt-hours of AC load between charges
Cabling and Hook-up Configurations
Parallel Connection
Series Connection
Batteries Connected in Series
Series-Parallel Connections
Batteries in Series-Parallel Connections
Page
Page
Xantrex Technology Inc
Related pages
Instructions Troubleshooting Tips Consumer Support for GE AGX08 AGX10
Architects and Engineers Specifications for AKG Acoustics C 414 B/ULS
Indicator lights for Smeg CV 270 AP
Auto Defrost Chart for LG Electronics LMAB1240ST
Chapter 3. How to Configure the Print Server for TP-Link tl-wps510u
Installazione di una scheda di memoria for Samsung SM-T555NZKATIM
Parts List for Engine Assembly for Campbell Hausfeld AL2810
Language code list can be found on for Pioneer DV-333
Deferred Binding is the Default for Kenwood HP 9000
What tools do I need for Bowflex assembly?
See tools required here
Top
Page
Image
Contents