How to check the hull unit

1.Press the POWER () switch on the control unit (for the display unit) to turn on

the equipment. Confirm that the lamps above the ON and switches light.

Transducer switches

2.Confirm that the 5V and UP lamps on the raise/lower control box are lit.

3.Remove the cover of the raise/lower control box and use a multimeter to measure the following voltages:

Terminal

Terminal No.

 

Voltage

TB-C101

(1) – (2), (6)

–(7)

220 VAC

 

(2) – (3), (7)

– (8)

220 VAC

 

(1) – (3), (6)

–(8)

220 VAC

4.In the raise/lower control box, set the TEST/NORMAL switch to TEST. Press the [DOWN] switch to confirm that the transducer lowers. Also, while the transducer is being lowered, check that the MD LED lights when the MD L. SW kicks. Note that the MD L. SW does not stop the transducer when the TEST/NORMAL switch is in the TEST position.

TEST

 

OFF

 

5V

NORMAL

 

L.SW

 

UP

MD

DN

UP

DOWN

Control unit (for the hull unit)

5.Press and release [DOWN] switch. Confirm that the transducer stops at the moment the switch is released.

6.Press the [DOWN] switch again. Confirm that the transducer stops at the moment the lower limit switch kick.

7.Confirm that the [UP] switch operators in a similar manner.

3-3

Image 51
Contents Check List Iii00080916714 Safety Instructions Projected Raising Lowering Mm stroke Max kt Standard type System ConfigurationControl Unit Black box typeStandard supply Equipment ListsSEM-21Q OptionsLocation of hull unit Mounting the Hull UnitMaintenance space, example sonar compartment Shortening the retraction tank Retraction tank Reinforcement rib 250-300 mm Remarks for installation of retraction tankInstalling hull unit on retraction tank Installation of hull unit Bow Stay Hull Unit Installing stays anti-vibration measureProcessor unit Mounting the Display UnitMonitor unit Mounting procedureMonitor unit Attaching the CRT filter Control unitFixing without KB fixing plate KB fixing plate Mounting the Transceiver Unit Mounting the Power Supply UnitGrounding the Equipment Procedure Page Mounting the Cable for Extension Kit option Attachment Kit option Using the optional attachment kit How to Use the Crimping Tool, Pin Extractor How to use the crimping toolHow to use the pin extractor Local supply Location of ConnectorsTransceiver unit side Fabrication of monitor cable 10S2074 10 m/10S2075 30 m Monitor UnitPositioning guide pins Control cable Assembling D-SUB connector CN-A302How to connect cables to the monitor unit 1 10S1258-1 cable Processor UnitPower cable Monitor cable 10S2074 or 10S2075 Optional equipment Schematic view of cablesGyro Processor EXT-KPunit Transceiver Unit Fabrication of connector 00-8016-038-313761HV CN-B101Hull control cable 10S2078 Fabrication of power cable type DPYCY-4 TB-B101Connection Power Supply Unit Cable for Extension KitJunction box Cable clamp CKS clamp Raise/Lower Control Box Power cable fabrication Adjustment and Check Test Menu OFF Heading adjustment Heading AdjustmentSystem menu OWN Ship Mark menu Configuring Own Ship MarkTD Position Other System Menu Items Interface Setting menuSpeed & Course EXT Data Setting menuWind Others menuLanguage Cone Board Setting in the Processor Unit Adjustment of signal level echo sounder connectedAdjusting the volume of audio alarm 1 CIF2/NMEA2 connector interface selection DIP Switch SettingSelecting the Net Sonde information Selecting echosounder signalTesting TX/RX independently at hull unit This page is intentionally left blank Connecting the External Interface CS-120A VH4P PP GND Ciftxdh Ciftxdc Cifrxdh Cifrxdc Shield Check List Data Sheet Data Sheet Dispaly Unit FSV-2400 User menu Color response curve sheet H 工事材料表 006-921-240-00 10CO-X-9402 006-921-250-00 10CO-X-9403 10CO-X-9412 Page 10CO-X-9406 10CO-X-9410 Furuno Electric CO .,LTD C1318-M10-C 付属品表 Page Page Page 000-144-382-00 000-155-839-10 000-157-497-10 Page Page Page Page Page Page Jan Jan Hatai Hatai Page Page Page Color Scanning Sonar Title FSV-24/24S Miyosi 制御部