Furuno FSV-24S installation manual Check List

Page 68

Check List

Ship Name

Date

/

/

Location

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SCANNING

 

TYPE

FSV-24

 

 

 

 

 

RESULT

 

SONAR

 

 

 

 

 

 

 

 

 

 

S/N

 

 

Monitor unit (FSV-2400)

 

 

Options

 

 

 

 

 

 

Control unit (FSV-2401)

 

 

CS-120A

 

 

 

 

 

 

Processor unit (FSV-2402)

 

 

VI-1100A

 

 

 

 

 

 

Transceiver unit (FSV-241E)

 

 

CS-170

 

 

 

 

 

 

Power supply unit (FSV-242)

 

 

FSV-2451(5m),FSV2452(15m)

 

 

 

 

Hull unit (FSV-243E/244E )

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Reference

 

 

 

 

 

 

 

 

 

 

Frequency

 

24KHz

 

 

 

 

 

 

 

 

Transducer location

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NO

CHECK ITEMS

 

CONTENT

 

 

RESULT

DATA

1

Unit installation

All units are installed according to installation

Good/No Good

 

 

 

 

 

manual.

 

 

 

 

 

 

 

2

Grounding

Copper plate should be connected for the

Good/No Good

Sheet 1

 

 

 

 

following units.

 

 

 

 

 

 

 

 

 

 

1.Power supply unit

 

 

 

 

 

 

 

 

 

 

2.Transceiver unit

 

 

 

 

 

 

 

 

 

 

3.Junction box(Option)

 

 

 

 

 

 

 

 

 

IV-8sq is connected for the following units.

 

 

 

 

 

 

 

1.Raise/lower box

 

 

 

 

 

 

 

 

 

 

2.Processor unit

 

 

 

 

 

 

 

 

 

 

3.Monitor unit

 

 

 

 

 

 

3

Connection

Check the connection between each unit.

Good/No Good

Sheet 1

 

 

 

 

1.Transducer-Transceiver unit

 

 

 

 

 

 

 

 

2.Transceiver unit-Processor unit

 

 

 

 

 

 

 

 

3.Processor unit-Monitor unit

 

 

 

 

 

 

 

 

4.Monitor unit-Control unit

 

 

 

 

 

 

 

 

 

5.Processor unit- Other equipments

 

 

 

 

 

 

 

6.Ship’s mains-Power supply unit

 

 

 

 

 

 

 

 

7.Ship’s mains-Hull unit

 

 

 

 

 

 

 

 

 

8.Ship’s mains-Processor unit

 

 

 

 

4

Power Supply

Check ship’s mains voltage for following units.

Good/No Good

Sheet 1

 

(Ship’s mains)

1.Power supply unit

 

 

 

 

 

 

 

 

 

 

2.Raise/lower motor line

 

 

 

 

 

 

 

 

 

Check whether led of phase detector is light or

 

 

 

 

 

 

 

not.

 

 

 

 

 

 

 

 

 

 

 

The 3 phase line must be changed if led is light.

 

 

 

 

 

 

 

3.Processor unit

 

 

 

 

 

 

5

Output power

Check output power and +B voltage.

Good/No Good

Fig1

6

Test

 

Check the following tests.

 

 

Good/No Good

Sheet2

 

 

 

 

Board test/Panel test/RX test/Channel

 

 

Installation

 

 

 

 

test1/Channel test2/Noise test

 

 

 

manual

7

Setting

 

Check the user program setting.

 

 

 

Sheet3

8

Operation check

Check pictures after turning on the power.

Good/No Good

 

AP-1

Image 68
Contents Iii Check List00080916714 Safety Instructions Projected Raising Lowering Mm stroke Max kt System Configuration Standard typeBlack box type Control UnitEquipment Lists Standard supplyOptions SEM-21QMounting the Hull Unit Location of hull unitMaintenance space, example sonar compartment Shortening the retraction tank Remarks for installation of retraction tank Retraction tank Reinforcement rib 250-300 mmInstalling hull unit on retraction tank Installation of hull unit Installing stays anti-vibration measure Bow Stay Hull UnitMounting the Display Unit Processor unitMounting procedure Monitor unitMonitor unit Control unit Attaching the CRT filterFixing without KB fixing plate KB fixing plate Mounting the Power Supply Unit Mounting the Transceiver UnitGrounding the Equipment Procedure Page Mounting the Cable for Extension Kit option Attachment Kit option Using the optional attachment kit How to use the pin extractor How to Use the Crimping Tool, Pin ExtractorHow to use the crimping tool Location of Connectors Local supplyTransceiver unit side Monitor Unit Fabrication of monitor cable 10S2074 10 m/10S2075 30 mPositioning guide pins Assembling D-SUB connector CN-A302 Control cableHow to connect cables to the monitor unit Processor Unit 1 10S1258-1 cablePower cable Monitor cable 10S2074 or 10S2075 Schematic view of cables Optional equipmentGyro Processor EXT-KPunit Fabrication of connector 00-8016-038-313761HV CN-B101 Transceiver UnitFabrication of power cable type DPYCY-4 TB-B101 Hull control cable 10S2078Connection Junction box Power Supply UnitCable for Extension Kit Cable clamp CKS clamp Raise/Lower Control Box Power cable fabrication Adjustment and Check Test Menu OFF Heading Adjustment Heading adjustmentSystem menu Configuring Own Ship Mark OWN Ship Mark menuTD Position Interface Setting menu Other System Menu ItemsEXT Data Setting menu Speed & CourseOthers menu WindLanguage Adjusting the volume of audio alarm Cone Board Setting in the Processor UnitAdjustment of signal level echo sounder connected DIP Switch Setting 1 CIF2/NMEA2 connector interface selectionSelecting echosounder signal Selecting the Net Sonde informationTesting TX/RX independently at hull unit This page is intentionally left blank Connecting the External Interface CS-120A VH4P PP GND Ciftxdh Ciftxdc Cifrxdh Cifrxdc Shield Check List Data Sheet Data Sheet Dispaly Unit FSV-2400 User menu Color response curve sheet H 工事材料表 006-921-240-00 10CO-X-9402 006-921-250-00 10CO-X-9403 10CO-X-9412 Page 10CO-X-9406 10CO-X-9410 Furuno Electric CO .,LTD C1318-M10-C 付属品表 Page Page Page 000-144-382-00 000-155-839-10 000-157-497-10 Page Page Page Page Page Page Jan Jan Hatai Hatai Page Page Page Color Scanning Sonar Title FSV-24/24S Miyosi 制御部