Furuno FSV-24S installation manual Remarks for installation of retraction tank

Page 12

1.1.3Remarks for installation of retraction tank

1.Make, if possible, the installation location a double bottom structure.

2.Install, if possible, the tank on the keel where the tank can be most firmly fixed.

3.Install the reinforcement ribs as near as possible to the top of the retraction tank, allowing space for tightening of bolts and nuts.

Retraction tank

Reinforcement rib

250-300 mm

How to install reinforcement ribs

4.Add a doubling plate at the location where the retraction tank is welded to the hull bottom. The size of the doubling plate is normally 1300 mm in diameter so that it may lie across two bottom frames.

5.Make the bow mark on the attachment flange with a chisel.

1-4

Image 12
Contents Iii Check List00080916714 Safety Instructions Projected Raising Lowering Mm stroke Max kt System Configuration Standard typeBlack box type Control UnitEquipment Lists Standard supplyOptions SEM-21QMounting the Hull Unit Location of hull unitMaintenance space, example sonar compartment Shortening the retraction tank Remarks for installation of retraction tank Retraction tank Reinforcement rib 250-300 mmInstalling hull unit on retraction tank Installation of hull unit Installing stays anti-vibration measure Bow Stay Hull UnitMounting the Display Unit Processor unitMounting procedure Monitor unitMonitor unit Control unit Attaching the CRT filterFixing without KB fixing plate KB fixing plate Mounting the Power Supply Unit Mounting the Transceiver UnitGrounding the Equipment Procedure Page Mounting the Cable for Extension Kit option Attachment Kit option Using the optional attachment kit How to Use the Crimping Tool, Pin Extractor How to use the crimping toolHow to use the pin extractor Location of Connectors Local supplyTransceiver unit side Monitor Unit Fabrication of monitor cable 10S2074 10 m/10S2075 30 mPositioning guide pins Assembling D-SUB connector CN-A302 Control cableHow to connect cables to the monitor unit Processor Unit 1 10S1258-1 cablePower cable Monitor cable 10S2074 or 10S2075 Schematic view of cables Optional equipmentGyro Processor EXT-KPunit Fabrication of connector 00-8016-038-313761HV CN-B101 Transceiver UnitFabrication of power cable type DPYCY-4 TB-B101 Hull control cable 10S2078Connection Power Supply Unit Cable for Extension KitJunction box Cable clamp CKS clamp Raise/Lower Control Box Power cable fabrication Adjustment and Check Test Menu OFF Heading Adjustment Heading adjustmentSystem menu Configuring Own Ship Mark OWN Ship Mark menuTD Position Interface Setting menu Other System Menu ItemsEXT Data Setting menu Speed & CourseOthers menu WindLanguage Cone Board Setting in the Processor Unit Adjustment of signal level echo sounder connectedAdjusting the volume of audio alarm DIP Switch Setting 1 CIF2/NMEA2 connector interface selectionSelecting echosounder signal Selecting the Net Sonde informationTesting TX/RX independently at hull unit This page is intentionally left blank Connecting the External Interface CS-120A VH4P PP GND Ciftxdh Ciftxdc Cifrxdh Cifrxdc Shield Check List Data Sheet Data Sheet Dispaly Unit FSV-2400 User menu Color response curve sheet H 工事材料表 006-921-240-00 10CO-X-9402 006-921-250-00 10CO-X-9403 10CO-X-9412 Page 10CO-X-9406 10CO-X-9410 Furuno Electric CO .,LTD C1318-M10-C 付属品表 Page Page Page 000-144-382-00 000-155-839-10 000-157-497-10 Page Page Page Page Page Page Jan Jan Hatai Hatai Page Page Page Color Scanning Sonar Title FSV-24/24S Miyosi 制御部