B. Sequence of Operation
1. Auxiliary Codes A-1 and Earlier
After the power switch is placed in the "ON" position, the steps in the sequence are as outlined below.
a)Freeze Cycle
BCH, GM, FM, CR, and Comp energize. NOTICE! Some units contain a sticker that states: "The bin control heater has been disconnected. DO NOT reconnect the bin control heater." In this case, leave BCH disconnected or replace BC assembly with 3A2561A03. Ice production starts 4 to 6 minutes after Comp energizes depending on ambient and water conditions. The freeze cycle continues until BC shuts down the icemaker or power is turned off to the icemaker. Refill: The
b)Bin Control Thermostat Shutdown
Ice fills storage bin to level of BC. BC opens within 10 seconds after ice contact. When BC opens, BCH remains energized. GM, FM, CR, and Comp de‑energize. When ice level lowers and BC closes, the icemaker starts operating again.
(auxiliary codes
|
|
|
| Low Water/ | 2. Shutdown |
|
| 1. Freeze Cycle | |||
|
|
|
|
| Bin Full |
|
| Refill | When STS closes, |
| |
|
| icemaker restarts at |
| ||
Power Switch | water into reservoir as needed. | 1. Freeze Cycle. |
| ||
"ON" |
|
|
|
| |
|
|
|
|
|
|
| STS | open |
|
| BC | open |
|
|
|
|
| ||||
BC closed | BC closed |
| BC closed | BC open | |||
STS closed | STS closed |
| STS open | STS closed | |||
BCH energized | BCH continues |
| BCH continues | BCH continues | |||
Comp energized | Comp continues | Comp | Comp | ||||
FM energized | FM continues |
| FM | FM | |||
GM energized | GM continues |
| GM | GM |
BC closed
Legend: