5)Disconnect the gauge manifold hose from the vacuum pump and attach it to a refrigerant service cylinder. Remember to loosen the connection and purge the air from the hose. See the nameplate for the required refrigerant charge. Hoshizaki recommends only virgin refrigerant or reclaimed refrigerant which meets the requirements of ARI Standard 700 (latest edition) be used.
6)A liquid charge is recommended when charging an
7)Allow the system to charge with liquid until the proper charge weight is met.
8)Close the
9)Cap the access valve to prevent a possible leak.
B.Important Notes for Component Replacement
NOTICE
When replacing a component listed below, see the notes to help ensure proper operation.
Component | Notes |
|
|
Compressor | Install a new drier and PTC relay. |
| Evaporator Assembly Components. See Fig. 9. |
|
|
Upper and Lower | Inspect the upper bearing for wear. See "V.C.1. Upper Bearing Wear Check." Replace |
Bearings | if necessary. When replacing the upper bearing it is advised to also change the lower |
| bearing at the same time. |
|
|
Evaporator | • Install a new drier. |
| • Inspect the mechanical seal and |
| cracked, or scratched, the mechanical seal should also be replaced. |
|
|
Gear Motor | Install a new gear motor capacitor. |
|
|
39