Hoshizaki 73180 service manual Performance Data, 100BAF Series

Page 23

C. Performance Data

1. C-100BAF Series

APPROXIMATE ICE

AMBIENT TEMP.

 

 

 

WATER TEMP. (ºF/ºC)

 

 

PRODUCTION PER 24 HR.

 

 

 

 

 

(ºF/ºC)

 

 

50/10

 

 

70/21

 

 

90/32

 

 

 

 

 

 

 

 

 

 

 

 

 

 

70/21

 

92

42

 

89

40

 

84

38

 

 

 

 

80/27

 

81

37

 

71

32

 

66

30

 

 

 

 

90/32

 

66

30

 

62

28

 

57

26

lbs./day

 

kg./day

 

100/38

 

55

25

 

54

24

 

49

22

 

 

 

 

 

 

 

 

 

 

 

APPROXIMATE ELECTRIC

70/21

 

 

297

 

 

308

 

 

309

CONSUMPTION

80/27

 

 

310

 

 

310

 

 

312

 

 

 

 

 

 

 

 

 

 

 

 

 

 

90/32

 

 

313

 

 

310

 

 

316

watts

 

 

 

100/38

 

 

316

 

 

316

 

 

316

APPROXIMATE WATER

70/21

 

11

0.04

 

11

0.04

 

10

0.04

CONSUMPTION PER 24 HR.

80/27

 

10

0.04

 

9

0.03

 

8

0.03

 

 

 

 

 

 

 

 

 

 

 

90/32

 

8

0.03

 

8

0.03

 

7

0.08

gal./day

 

m3/day

100/38

 

7

0.03

 

6

0.02

 

6

0.02

Evaporator Outlet

70/21

 

23

-5

 

23

-5

 

23

-5

 

 

 

 

80/27

 

23

-5

 

28

-2

 

28

-2

 

 

 

 

90/32

 

28

-2

 

28

-2

 

34

1

ºF

ºC

100/38

 

34

1

 

34

1

 

34

1

HEAD PRESSURE

70/21

 

115

8.1

 

130

9.1

 

141

9.9

 

 

 

 

80/27

 

126

8.9

 

149

10.5

 

156

11.0

 

 

 

 

90/32

 

130

9.1

 

165

11.6

 

174

12.2

PSIG

kg/cm2G

100/38

 

129

9.1

 

167

11.7

 

183

12.9

SUCTION PRESSURE

70/21

 

12

0.8

 

13

0.9

 

15

1.1

 

 

 

 

80/27

 

13

0.9

 

15

1.1

 

16

1.1

 

 

 

 

90/32

 

13

0.9

 

17

1.2

 

18

1.3

PSIG

kg/cm2G

100/38

 

13

0.9

 

17

1.2

 

19

1.3

TOTAL HEAT OF REJECTION FROM CONDENSER

 

1850 BTU/h [AT 90ºF (32ºC) / WT 70ºF (21ºC)]

Note:

1.The data not in bold should be used for reference only.

2.We reserve the right to make changes in specifications and design without prior notice.

23

Image 23
Contents 100BAF-DS 100BAF-AD 100BAF-ADDS Hoshizaki AMERICA, INC Contents Page Important Safety Information Page Auxiliary Codes A-1 and Earlier Specifications 100BAFAuxiliary Codes A-2 and Later 100BAF-DS 100BAF-DS, 2. Auxiliary Codes A-2 and Later 100BAF-AD 100BAF-AD, 2. Auxiliary Codes A-2 and Later 100BAF-ADDS 100BAF-ADDS, 2. Auxiliary Codes A-2 and Later Auxiliary Codes II. General Information ConstructionFront Auxiliary Codes RearIcemaking Unit Freeze Cycle Sequence of OperationFill Cycle Auxiliary Codes A-1 and Earlier Auxiliary Codes A-2 and Later Auxiliary Codes A-2 and Later Wiring DiagramIcemaker with Optional Drain Pump HS-0248 100BAF Series Performance DataIce Production Check IV. Service DiagnosisDiagnostic Procedure Page Auxiliary Codes A-2 and Later Bin Control Check Float Switch Check Lower Float white Plastic Retainer Clip Float Switch CleaningDrain Pump Check Optional Drain Pump HS-0248Overview Priming Instructions Float Switch Cleaning No Ice Production Possible Cause Startup Diagnostic ChartsShutdown Fill Cycle and Refill Cycle Shutdown Refrigerant Recovery Removal and Replacement of ComponentsService for Refrigerant Lines Evacuation and Recharge R-134a BrazingComponent Important Notes for Component ReplacementRemoval and Replacement of Evaporator Assembly Components Upper Bearing Wear Check Removal and Replacement of Extruding Head Removal and Replacement of Auger Removal and Replacement of Evaporator Page 5b. Lower Housing Page VI. Maintenance Frequency Area Task Maintenance ScheduleCleaning Solution Cleaning and Sanitizing InstructionsPage Sanitizing Solution Page Cleaning Solution Page Sanitizing Solution Storage Bin Drain Condenser Auxiliary Codes A-1 and Earlier Skip to step VII. Preparing the Icemaker for Periods of Non-UseVIII. Disposal