Hoshizaki 73180 service manual Fill Cycle

Page 18

2. Auxiliary Codes A-2 and Later

After the power switch is placed in the "ON" position, the steps in the sequence are as outlined below.

a)Fill Cycle

LF/S and UF/S open, BCH and WV energize. LF/S closes. Nothing happens at this time. Reservoir continues to fill until UF/S closes.

b)Freeze Cycle

UF/S closes. BCH remains energized. WCR, TDR, GM, FM, CR, and Comp energize. WV de‑energizes. Ice production starts 4 to 6 minutes after Comp energizes depending on ambient and water conditions. F/S controls WV to refill as needed during the freeze cycle. The freeze cycle continues until BC shuts down the icemaker or power is turned off to the icemaker. Refill: As ice is produced, the water level in the reservoir drops and UF/S opens. When UF/S opens, a latching circuit through LF/S and WCR keeps WCR, TDR, GM, FM, CR, and Comp energized. When LF/S opens, WCR de-energizes, cutting power to TDR terminal #5 (O wire) and starting FT. WV energizes. Water fills the reservoir, UF/S closes. WCR energizes, restoring power to TDR terminal #5 (O wire) and resetting FT. WV de-energizes. If UF/S remains open longer than 90 seconds, FT terminates, cutting power to TDR terminal #9 (R wire). GM, FM, CR, and Comp de‑energize. WV remains energized until UF/S closes.

c)Bin Control Thermostat Shutdown

Ice fills storage bin to level of BC. BC opens within 10 seconds after ice contact. When BC opens, BCH remains energized. WCR, TDR, GM, FM, CR, and Comp de‑energize. When ice level lowers and BC closes, the icemaker starts operating again.

C-100BAF Series Sequence Flow Chart and Component Operation

(auxiliary codes A-2 and later)

 

 

1. Fill Cycle

 

2. Freeze Cycle

 

Low Water Safety

3. Shutdown

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

When UF/S closes,

Bin Full

 

 

 

 

 

 

 

Refill

 

icemaker restarts at

 

 

 

 

 

 

 

 

FT (in TDR)

 

2. Freeze Cycle.

 

Power Switch

 

 

 

 

 

 

 

 

 

 

 

 

 

Maximum 90 seconds

 

90 seconds

 

"ON"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FT

 

 

 

BC

 

 

 

 

 

 

 

 

 

 

 

 

 

exceeded

 

 

open

 

 

 

BC closed

 

 

 

 

 

 

 

BC closed

BC closed

BC closed

 

BC closed

 

BC open

UF/S open

LF/S closed

UF/S open

LF/S closed

 

UF/S open

 

BCH continues

LF/S open

UF/S closed

LF/S open

UF/S closed

 

FT exceeded

 

Comp de-energized

BCH energized

BCH continues

FT starts (90 sec.)

FT terminated

 

BCH continues

 

FM de-energized

WV energized

Comp energized

BCH continues

BCH continues

WV continues

 

GM de-energized

 

FM energized

Comp continues

Comp continues

Comp de-energized

WV de-energized

 

GM energized

FM continues

FM continues

 

FM de-energized

 

 

 

 

 

WV de-energized

GM continues

GM continues

 

GM de-energized

 

 

 

 

 

 

WV energized

WV de-energized

 

 

 

 

 

 

BC closed

Legend: BC–bin control thermostat; BCH–bin control heater; Comp–compressor; CR–compressor relay; FM–fan motor; FT–90-second fill timer (low water safety; internal to TDR); GM–gear motor; LF/S–lower float switch; TDR–time delay relay; UF/S–upper float switch; WCR–water control relay; WV–inlet water valve

18

Image 18
Contents 100BAF-DS 100BAF-AD 100BAF-ADDS Hoshizaki AMERICA, INC Contents Page Important Safety Information Page Specifications 100BAF Auxiliary Codes A-1 and EarlierAuxiliary Codes A-2 and Later 100BAF-DS 100BAF-DS, 2. Auxiliary Codes A-2 and Later 100BAF-AD 100BAF-AD, 2. Auxiliary Codes A-2 and Later 100BAF-ADDS 100BAF-ADDS, 2. Auxiliary Codes A-2 and Later Auxiliary Codes Rear II. General Information ConstructionFront Auxiliary CodesIcemaking Unit Sequence of Operation Freeze CycleFill Cycle Auxiliary Codes A-1 and Earlier Auxiliary Codes A-2 and Later Wiring Diagram Auxiliary Codes A-2 and LaterIcemaker with Optional Drain Pump HS-0248 Performance Data 100BAF SeriesIV. Service Diagnosis Diagnostic ProcedureIce Production Check Page Auxiliary Codes A-2 and Later Bin Control Check Float Switch Check Float Switch Cleaning Lower Float white Plastic Retainer ClipOptional Drain Pump HS-0248 OverviewDrain Pump Check Priming Instructions Float Switch Cleaning Diagnostic Charts No Ice Production Possible Cause StartupShutdown Fill Cycle and Refill Cycle Shutdown Removal and Replacement of Components Service for Refrigerant LinesRefrigerant Recovery Brazing Evacuation and Recharge R-134aImportant Notes for Component Replacement ComponentRemoval and Replacement of Evaporator Assembly Components Upper Bearing Wear Check Removal and Replacement of Extruding Head Removal and Replacement of Auger Removal and Replacement of Evaporator Page 5b. Lower Housing Page VI. Maintenance Maintenance Schedule Frequency Area TaskCleaning and Sanitizing Instructions Cleaning SolutionPage Sanitizing Solution Page Cleaning Solution Page Sanitizing Solution Storage Bin Drain Condenser VII. Preparing the Icemaker for Periods of Non-Use Auxiliary Codes A-1 and Earlier Skip to stepVIII. Disposal