INSTALLATION
LOG SET
INSTALLATION
3) Place Rear Log | 6) Place the Left Top Log |
the rear log support. | Log |
|
Read the instructions below carefully and refer to the diagrams. If logs are broken do not use the unit until they are replaced. Broken logs can interfere with the pilot operation.
The gas log kit contains the following:
a) | Rear Log | ||
b) | Front Right Log | ||
c) | Middle Left Log | ||
d) | Left Top Log | ||
e ) | Center Log | ||
f) | Middle Right Log | ||
g) | Front Left Log | ||
h) |
| Embers | |
i) |
| Rockwool | |
j) |
| Vermiculite |
Pins on Rear Log Support
4)Place Front Right Log
D)02-46
A)02-43
C)02-56
PinCutout
7)Place the notch in Center Log
Note: Install Optional Brick Panels prior to installing logs.
|
|
|
|
|
5)Place the Middle Left Log
Notch Cutout
The "02" refer numbers (i.e.
molded into the rear of each log.
1)Carefully remove the logs from the box and unwrap them. The logs are fragile, handle with care - do not force into position.
2)Sprinkle the vermiculite around the firebox base. Take some of the embers (approx. 1/3 of the bag) and sprinkle over the ver- miculite.
Vermiculite and | Vermiculite | and | Vermiculite and | |
embers. | embers. | |||
embers. |
| |||
|
|
|
Logs D)02-46 and E)02-47 in position.
8)Position notch in Front Right Log
Logs
Notch | Bracket |
9 |