Vermont Casting 36CDVTRN Below Grade Installations, Vertical Through-the-Roof Applications

Page 18

CDV Series Direct Vent Gas Fireplace

Below Grade Installations

When it is not possible to meet the required vent ter- minal clearances of 12” (305 mm) above grade level a snorkel vent kit #7TDVSNORK is required. It allows installation depth of down to 7” (178 mm) below grade level. The 7” is measured from the center of the hori- zontal vent pipe as it penetrates through the wall.

If venting system is installed below ground, we recommend a window well with adequate and proper drainage.

Ensure sidewall venting clearances are observed.

Do not back fill around snorkel. A clearance of at least 4” (102 mm) must be maintained between the snorkel and the soil.

If the foundation is recessed, use recess brackets (not supplied) for securing lower portion of the snorkel. Fasten brackets to wall first, then secure to snorkel with self drilling #8 x 1/2 sheet metal screws. It will be necessary to extend vent pipes out as far as protruding wall face. (Fig. 31)

The maximum horizontal run with 24” vertical rise is 36” (914 mm) from the back of the fireplace to the face of the exterior wall. See vent graph (Page 12) for extended horizontal run if the vertical rise exceeds 24” (610 mm).

1.

Establish vent hole through the wall. (Fig. 13)

2.

Remove soil to a depth of approximately 16”

 

(406mm) below base of snorkel. Install window

 

well (not supplied). Refill hole with 12” (305 mm) of

 

coarse gravel leaving a clearance of approximately

Foundation Recess

Recess Brackets

Watertight Seal

Around Pipe

Snorkel

Wall Screws

Sheet Metal

Screws

BG401

 

4” (102 mm) below snorkel. (Fig. 30)

3.

Install vent system. See Page 12, Steps 2 through 5.

4.

Ensure a watertight seal is made around the vent

 

pipe coming through the wall.

5.

Apply high temperature sealant caulking (supplied)

 

around the 4” and 7” snorkel collars.

6.

Slide into the vent pipe and secure to the wall.

7.

Level the soil to maintain a 4” (102 mm) clearance

 

below snorkel. (Fig. 30)

Fig. 31 Snorkel installation, recessed foundation.

Vertical Through-the-Roof Applications

This Gas Fireplace has been approved for:

1.Vertical installations up to 40’ (12 m) in height. Up to 10’ (3 m) horizontal vent run can be installed within the vent system using a maximum of three 90° elbows.

7TDVSNORK

(Snorkel)

Maximum

4” (102mm) Clearance

Minimum

10’ (3 m)

Firestop

7” Pipe

24" (610mm)

Minimum*

Min.

Window Well

Gravel

Drain

Foundation Wall

*A minimum of 24” (608mm) vertical pipe must be installed when using 7TDVSNORK Kit.

8’ (2.4 m) / Maximum

40’ (12 m) Vertical Rise

Pipe Straps Every 3’ (914 mm)

CFM148

Fig. 32 Support straps for horizontal runs.

2. Up to two 45° elbows may be used within the

horizontal run. For each 45° elbow used on the

BG400

Fig. 30 Below grade installation.

horizontal level the maximum horizontal length must

be reduced by 18” (457 mm).

18

20010175

Image 18
Contents Builder Direct Vent Models Table of Contents Installation & Operating Instructions Locating Your FireplacePlease Review the Following Carefully 36CDVR Fireplace Dimensions Rear VentFraming Dimensions Must be adhered toFireplace Dimensions Top Vent 36CDVTClearance to Combustibles MantelsHearth Final Finishing Hood InstallationFraming and Finishing Gas SpecificationsGas Inlet and Manifold Pressures Gas Line InstallationRemote ON/OFF Switch High ElevationsGeneral Venting Location of Vent TerminationCanadian Installations1 US Installations2 General Venting Information Termination LocationGeneral Information Assembling Vent Pipes Canadian InstallationsUSA Installations Flex Vent PipesRear Wall Venting Applications How to Use the Vent Graph36CDVR Venting From Rear of UnitRear Wall Installation Twist Lock Pipe StepRear Wall Vent Installations Flex Vent Pipe Bend flex pipe up 90 as close to fireplace as pos- sibleVertical Sidewall Applications Secure collar in place, slide termination into collarVertical Sidewall Installation Maximum horizontal vent runAlways install hori- zontal venting on a level plane Below Grade Installations Vertical Through-the-Roof ApplicationsVertical Through-the-Roof Installation Enlarged ends of the vent section always face downward. FigTypical straight-up installation 36CDVT Vertical Venting+ B = 17 5.2m Max Vertical Sidewall Installations Always install horizontal venting on a level planeThrough the wall Example Maximum horizontal length Roof and ceiling supports Min 610 mm Venting Components Operating Instructions Glass CleaningWindow Frame Assembly Removal Glass InformationLogs Flame CharacteristicsFlame & Temperature Adjustment RN/RP & EN/EP ModelsLighting and Operating Instructions To Turn Off Gas to FireplaceWhat to do if YOU Smell GAS Lighting Instructions Turning Off the Gas to the ApplianceValve in the on position Troubleshooting the Gas Control System Fuel Conversion Instructions SIT top Convertible PilotSIT 820 Nova Gas Control Valve Fig Maintenance Cleaning the Standing Pilot Control SystemBurner and Burner Compartment Description 36CDVCDV Fuel Conversion KitsRemote Controls Optional Accessories AvailableWiring Instructions Fan KitsCDV Series Direct Vent Gas Fireplace Limited Lifetime Warranty Product Covered by this WarrantyCFM Corporation