Framing and Finishing

Check fireplace to make sure it is levelled and properly positioned.

To mount the appliance:

1.Choose the location.

2.This unit comes with four (4) flanges pre-mounted on both sides of the fireplace to allow two different drywall thicknesses to be used. Flange “A” is for 1/2” drywall while flange “B” is for 5/8” drywall.

3.Bend the desired flanges out 90° on both sides of the fireplace. Slide the fireplace into the framed opening until the flanges contact the front surfaces of the framing. Level the unit and secure it firmly in place.

4.The standoffs are adjustable for different drywall thicknesses. The unit is shipped from the factory at 1/2” (13 mm). Loosen the four (4) screws securing each standoff to the top of the fireplace. Slide the standoff back. Tighten the screws. This yields a 5/8” (16 mm) thick drywall space. Removing the standoff and having the tabs on the standoff face the rear of the unit yields a 3/4” (19 mm) drywall space. (Fig. 4)

NOTE: Drywall must stop at standoffs and not touch top of unit.

Flange

Drywall

Flange Location for Desired

Position

Depth

Drywall Depth at Header

A1/2” / 13 mm

B

5/8” / 16 mm

B A

FP1603

Standoff Location for Desired Drywall Depth at Header

Screws

Tabs

FP1603a

Fig. 4 Nailing flanges and standoffs.

20010175

CDV Series Direct Vent Gas Fireplace

Hood Installation

CAUTION: Hood MUST be permanently installed.

1.Remove top louvre. Carefully remove hood from inside top louvre opening.

2.Remove three (3) sheet metal screws in bottom flange of fireplace surround top.

3.Install the hood by aligning the three holes in bottom flange of fireplace surround top. (Fig. 4a)

4.Secure hood to bottom flange of fireplace surround top using three screws removed in Step 2. (Fig. 4a)

5.Carefully remove protectors under the relief plates on top of the firebox.

6.Replace top louvre.

Hood

Sheet

Metal

Screws

FP1609

Fig. 4a Secure hood to fireplace with sheet metal screws.

Final Finishing

Noncombustible materials such as brick or tile may be extended over the edges of the face of the fireplace. DO NOT cover any vent or grille panels.

If a Trim Kit is going to be installed on the fireplace, the brick or tile will have to be installed flush with the edges of the fireplace.

36CDVR / 36CDVT

Certified To

ANSI Z21.88b-2003 / CSA 2.33b-2003

Vented Gas Fireplace Heaters

36CDVRRN Units: GFRL1J0

36CDVTRN Units: GFTN1J0

Gas Specifications

 

 

 

Max.

Min.

 

 

 

Input

Input

 

 

 

Model

Fuel

Gas Control

BTU/h

BTU/h

36CDVRRN

Nat

Millivolt

21,000

14,700

36CDVRRP*

Prop

Millivolt

21,000

15,750

36CDVTRN

Nat

Millivolt

21,000

14,700

36CDVTRP*

Prop

Millivolt

21,000

15,750

*Using conversion kit

7

Image 7
Contents Builder Direct Vent Models Table of Contents Locating Your Fireplace Installation & Operating InstructionsPlease Review the Following Carefully Must be adhered to Fireplace Dimensions Rear VentFraming Dimensions 36CDVR36CDVT Fireplace Dimensions Top VentMantels Clearance to CombustiblesHearth Gas Specifications Hood InstallationFraming and Finishing Final FinishingHigh Elevations Gas Line InstallationRemote ON/OFF Switch Gas Inlet and Manifold PressuresLocation of Vent Termination General VentingGeneral Venting Information Termination Location Canadian Installations1 US Installations2Flex Vent Pipes Canadian InstallationsUSA Installations General Information Assembling Vent PipesFrom Rear of Unit How to Use the Vent Graph36CDVR Venting Rear Wall Venting ApplicationsStep Rear Wall Installation Twist Lock PipeBend flex pipe up 90 as close to fireplace as pos- sible Rear Wall Vent Installations Flex Vent PipeSecure collar in place, slide termination into collar Vertical Sidewall ApplicationsMaximum horizontal vent run Vertical Sidewall InstallationAlways install hori- zontal venting on a level plane Vertical Through-the-Roof Applications Below Grade InstallationsEnlarged ends of the vent section always face downward. Fig Vertical Through-the-Roof Installation36CDVT Vertical Venting Typical straight-up installation+ B = 17 5.2m Max Always install horizontal venting on a level plane Vertical Sidewall InstallationsThrough the wall Example Maximum horizontal length Roof and ceiling supports Min 610 mm Venting Components Glass Information Glass CleaningWindow Frame Assembly Removal Operating InstructionsRN/RP & EN/EP Models Flame CharacteristicsFlame & Temperature Adjustment LogsTo Turn Off Gas to Fireplace Lighting and Operating InstructionsWhat to do if YOU Smell GAS Turning Off the Gas to the Appliance Lighting InstructionsValve in the on position Troubleshooting the Gas Control System SIT top Convertible Pilot Fuel Conversion InstructionsSIT 820 Nova Gas Control Valve Fig Cleaning the Standing Pilot Control System MaintenanceBurner and Burner Compartment 36CDV DescriptionFuel Conversion Kits CDVFan Kits Optional Accessories AvailableWiring Instructions Remote ControlsCDV Series Direct Vent Gas Fireplace Product Covered by this Warranty Limited Lifetime WarrantyCFM Corporation