Vermont Casting 36CDVTRN, 36CDVRRN installation instructions Example Maximum horizontal length

Page 24

CDV Series Direct Vent Gas Fireplace

Zero Clearance Sleeve

Screws

(if required)

 

 

7TDVSNORK

Firestop

(Snorkel)

 

7” Pipe

4” (102mm)

Clearance

 

 

Min.

24” (610mm)

Window

Well

Minimum*

 

 

Gravel

 

Drain

 

Foundation Wall

 

*A minimum of 24” (610mm) ver-

 

tical pipe must be installed when

 

using the 7TDVSNORK Kit.

 

*The 22” (559mm) vertical rise

 

(center to center) of the snorkel

 

may be included for calculationof

 

max. horizontal run.

BG402

 

Fig. 48 Below grade installation.

Do not back fill around snorkel. A clearance of at least 4” (102 mm) must be maintained between snorkel and the soil.

If the foundation is recessed, use recess brackets (not supplied) for securing lower portion of the snorkel. Fasten brackets to wall first, then secure to snorkel with self drilling #8 x 1/2 sheet metal screws. It will be necessary to extend vent pipes out as far as protruding wall face. (Fig. 49)

Vertical Through-the-Roof Applications

This Gas Fireplace has been approved for:

Vertical installations up to 40’ (12 m) in height. Up to a 10’ (3 m) horizontal vent run can be installed within the vent system using a maximum of two 90° elbows. (Fig. 50)

Max. 10' (3m)

Max. Height

40' (12m)

Min. Height 7���' (2.3m)

Pipe Straps Every 3’ (914mm)

FP1244

Fig. 50 Support straps for horizontal runs.

Foundation Recess

Recess Brackets

Watertight Seal

Around Pipe

Snorkel

Wall Screws

Sheet Metal

Screws

BG401

Up to two 45° elbows may be used within the

horizontal run. For each 45° elbow used on the

horizontal level the maximum horizontal length must

be reduced by 18” (457 mm).

Example: Maximum horizontal length

0

x

45° elbows = 10’ 93 m)

1

x

45° elbows = 8¹⁄₂’ (2.6 m)

2

x

45° elbows = 7’ (2.1 m)

A minimum of an 8’ (2.4 m) vertical rise.

Two sets of 45° elbows offsets within these vertical

Fig. 49 Snorkel installation, recessed foundation.

installations. From 0 to a maximum of 8’ (2.m) of

vent pipe can be used between elbows. (Fig. 51)

7DVCS must be used to support offsets. (Fig. 53)

This application will require that you first determine

the roof pitch and use the appropriate starter kit.

(Refer to Venting Components List)

The minimum height of the vent above the highest

point of penetration through the roof is 2’ (610 mm).

(Fig. 55)

24

20010175

Image 24
Contents Builder Direct Vent Models Table of Contents Installation & Operating Instructions Locating Your FireplacePlease Review the Following Carefully Fireplace Dimensions Rear Vent Framing Dimensions36CDVR Must be adhered toFireplace Dimensions Top Vent 36CDVTClearance to Combustibles MantelsHearth Hood Installation Framing and FinishingFinal Finishing Gas SpecificationsGas Line Installation Remote ON/OFF SwitchGas Inlet and Manifold Pressures High ElevationsGeneral Venting Location of Vent TerminationCanadian Installations1 US Installations2 General Venting Information Termination LocationCanadian Installations USA InstallationsGeneral Information Assembling Vent Pipes Flex Vent PipesHow to Use the Vent Graph 36CDVR VentingRear Wall Venting Applications From Rear of UnitRear Wall Installation Twist Lock Pipe StepRear Wall Vent Installations Flex Vent Pipe Bend flex pipe up 90 as close to fireplace as pos- sibleVertical Sidewall Applications Secure collar in place, slide termination into collarVertical Sidewall Installation Maximum horizontal vent runAlways install hori- zontal venting on a level plane Below Grade Installations Vertical Through-the-Roof ApplicationsVertical Through-the-Roof Installation Enlarged ends of the vent section always face downward. FigTypical straight-up installation 36CDVT Vertical Venting+ B = 17 5.2m Max Vertical Sidewall Installations Always install horizontal venting on a level planeThrough the wall Example Maximum horizontal length Roof and ceiling supports Min 610 mm Venting Components Glass Cleaning Window Frame Assembly RemovalOperating Instructions Glass InformationFlame Characteristics Flame & Temperature AdjustmentLogs RN/RP & EN/EP ModelsLighting and Operating Instructions To Turn Off Gas to FireplaceWhat to do if YOU Smell GAS Lighting Instructions Turning Off the Gas to the ApplianceValve in the on position Troubleshooting the Gas Control System Fuel Conversion Instructions SIT top Convertible PilotSIT 820 Nova Gas Control Valve Fig Maintenance Cleaning the Standing Pilot Control SystemBurner and Burner Compartment Description 36CDVCDV Fuel Conversion KitsOptional Accessories Available Wiring InstructionsRemote Controls Fan KitsCDV Series Direct Vent Gas Fireplace Limited Lifetime Warranty Product Covered by this WarrantyCFM Corporation