Vermont Casting 36CDVRRN, 36CDVTRN installation instructions Fireplace Dimensions Top Vent

Page 5

CDV Series Direct Vent Gas Fireplace

Fireplace Dimensions - Top Vent

U

 

Rough

G

U

Opening

Depth

 

 

W

H

 

 

 

F

 

V

 

X - Rough Opening Width

 

 

T

Rough

 

 

Opening

 

 

Height

 

 

 

Gas Line

 

B

 

Access

Y

 

 

 

 

 

 

 

R

Q

Low

P

 

Voltage

S

 

Access

 

 

D

A

 

Electrical

C

Access

 

E Gas Line Access

J

K

 

O

L

N

Low Voltage

M

Electrical

 

Access

Fig. 2 Fireplace specifications and framing dimensions.

Ref.

36CDVT

A

35¹⁄

(895 mm)

B

35³⁄

(883 mm)

C

32¹⁄

(816 mm)

D

33”

(838 mm)

E

21¹⁄

(537 mm)

F

16⁵⁄

(422 mm)

G

25”

(635 mm)

H

8”

(203 mm)

J

3¹⁄

(83 mm)

K

2⁷⁄

(73 mm)

L

1³⁄

(35 mm)

M

14”

(356 mm)

N

8¹⁄

(216 mm)

O

7³⁄

(187 mm)

P

1³⁄

(35 mm)

Q

3¹⁄

(83 mm)

R

7³⁄

(187 mm)

S

8¹⁄

(216 mm)

 

Framing Dimensions

T

58³⁄

(1483 mm)

U

41³⁄

(1051 mm)

V

29¹⁄

(740 mm)

W

17¹⁄

(435 mm)

X

36¹⁄

(921 mm)

Y

35”

(889 mm)

20010175

5

Image 5
Contents Builder Direct Vent Models Table of Contents Please Review the Following Carefully Installation & Operating InstructionsLocating Your Fireplace Framing Dimensions Fireplace Dimensions Rear Vent36CDVR Must be adhered to36CDVT Fireplace Dimensions Top VentHearth Clearance to CombustiblesMantels Framing and Finishing Hood InstallationFinal Finishing Gas SpecificationsRemote ON/OFF Switch Gas Line InstallationGas Inlet and Manifold Pressures High ElevationsLocation of Vent Termination General VentingGeneral Venting Information Termination Location Canadian Installations1 US Installations2USA Installations Canadian InstallationsGeneral Information Assembling Vent Pipes Flex Vent Pipes36CDVR Venting How to Use the Vent GraphRear Wall Venting Applications From Rear of UnitStep Rear Wall Installation Twist Lock PipeBend flex pipe up 90 as close to fireplace as pos- sible Rear Wall Vent Installations Flex Vent PipeSecure collar in place, slide termination into collar Vertical Sidewall ApplicationsMaximum horizontal vent run Vertical Sidewall InstallationAlways install hori- zontal venting on a level plane Vertical Through-the-Roof Applications Below Grade InstallationsEnlarged ends of the vent section always face downward. Fig Vertical Through-the-Roof Installation36CDVT Vertical Venting Typical straight-up installation+ B = 17 5.2m Max Always install horizontal venting on a level plane Vertical Sidewall InstallationsThrough the wall Example Maximum horizontal length Roof and ceiling supports Min 610 mm Venting Components Window Frame Assembly Removal Glass CleaningOperating Instructions Glass InformationFlame & Temperature Adjustment Flame CharacteristicsLogs RN/RP & EN/EP ModelsWhat to do if YOU Smell GAS Lighting and Operating InstructionsTo Turn Off Gas to Fireplace Valve in the on position Lighting InstructionsTurning Off the Gas to the Appliance Troubleshooting the Gas Control System SIT 820 Nova Gas Control Valve Fig Fuel Conversion InstructionsSIT top Convertible Pilot Burner and Burner Compartment MaintenanceCleaning the Standing Pilot Control System 36CDV DescriptionFuel Conversion Kits CDVWiring Instructions Optional Accessories AvailableRemote Controls Fan KitsCDV Series Direct Vent Gas Fireplace Product Covered by this Warranty Limited Lifetime WarrantyCFM Corporation