Vertical Sidewall Applications

Since it is very important that the vent- ing system maintain its balance between the combustion air intake and the flue gas exhaust, certain limitations as to vent configurations apply and must be strictly adhered to.

The vent graph showing the relationship between verti- cal and horizontal side wall venting will help to deter- mine the various dimensions allowable.

Minimum clearance between vent pipes and combustible materials is one 1” (25 mm) on top, bottom and sides unless otherwise noted.

When the vent termination exits through foundations less than 20” (508 mm) below siding outcrop, the vent pipe must flush up with the siding.

It is always best to locate the fireplace in such a way that minimizes the number of offsets and horizontal vent length of vent pipe from the flue collar of the fire- place to the face of the outer wall.

20' (6m)

(2.3m)

Pipe

Straps Every

3’ (914mm)

 

7.5'

Pipe Straps

Every 3’ (914mm)

 

 

Firestop/Zero

 

Clearance Sleeve

 

FP1012

Fig. 39 Support straps for horizontal runs.

Horizontal plane means no vertical rise exists on this portion of the vent assembly.

The maximum number of 90° elbows per side wall installations is three (3).

If a 90° elbow is fitted directly onto the fireplace flange the maximum horizontal vent run before the termination or a vertical rise is 36” (914 mm).

If a 90° elbow is used in the horizontal vent run (level height maintained) the maximum horizontal vent length is reduced by 36” (914 mm). This does not apply if the 90° elbows are used to increase or redirect a vertical rise.

Example: According to the chart the maximum horizontal vent length in a system with a 7.5’ (2.3 m) vertical rise is 20’ (6 m) and if a 90° is required in the horizontal vent it must be reduced to 17’ (5.2 m). In Figure 41, Dimension A plus B must not be

greater than 17’ (5.2 m).

CDV Series Direct Vent Gas Fireplace

3'

(914mm)

FP1237

Fig. 40 Maximum horizontal vent run.

A

B

7.5'

1 x 90° elbow in horizontal plane = 3’ (914mm)

(2.3m)

 

 

A + B = 17' (5.2m) Max.

 

FP1238

Fig. 41 Maximum vent run with elbows.

The maximum number of 45° elbows permitted per side wall installation is two (2). These elbows can be installed in either the vertical or horizontal run.

For each 45° elbow installed in the horizontal run, the length of the horizontal run MUST be reduced by 18” (457 mm). This does not apply if the 45° elbows are installed on the vertical part of the vent system.

The maximum number of elbow degrees in a system

is 270°. (Fig. 42)

20010175

21

Image 21
Contents Builder Direct Vent Models Table of Contents Installation & Operating Instructions Locating Your FireplacePlease Review the Following Carefully Framing Dimensions Fireplace Dimensions Rear Vent36CDVR Must be adhered to36CDVT Fireplace Dimensions Top VentClearance to Combustibles MantelsHearth Framing and Finishing Hood InstallationFinal Finishing Gas SpecificationsRemote ON/OFF Switch Gas Line InstallationGas Inlet and Manifold Pressures High ElevationsLocation of Vent Termination General VentingGeneral Venting Information Termination Location Canadian Installations1 US Installations2USA Installations Canadian InstallationsGeneral Information Assembling Vent Pipes Flex Vent Pipes36CDVR Venting How to Use the Vent GraphRear Wall Venting Applications From Rear of UnitStep Rear Wall Installation Twist Lock PipeBend flex pipe up 90 as close to fireplace as pos- sible Rear Wall Vent Installations Flex Vent PipeSecure collar in place, slide termination into collar Vertical Sidewall ApplicationsMaximum horizontal vent run Vertical Sidewall InstallationAlways install hori- zontal venting on a level plane Vertical Through-the-Roof Applications Below Grade InstallationsEnlarged ends of the vent section always face downward. Fig Vertical Through-the-Roof Installation36CDVT Vertical Venting Typical straight-up installation+ B = 17 5.2m Max Always install horizontal venting on a level plane Vertical Sidewall InstallationsThrough the wall Example Maximum horizontal length Roof and ceiling supports Min 610 mm Venting Components Window Frame Assembly Removal Glass CleaningOperating Instructions Glass InformationFlame & Temperature Adjustment Flame CharacteristicsLogs RN/RP & EN/EP ModelsLighting and Operating Instructions To Turn Off Gas to FireplaceWhat to do if YOU Smell GAS Lighting Instructions Turning Off the Gas to the ApplianceValve in the on position Troubleshooting the Gas Control System Fuel Conversion Instructions SIT top Convertible PilotSIT 820 Nova Gas Control Valve Fig Maintenance Cleaning the Standing Pilot Control SystemBurner and Burner Compartment 36CDV DescriptionFuel Conversion Kits CDVWiring Instructions Optional Accessories AvailableRemote Controls Fan KitsCDV Series Direct Vent Gas Fireplace Product Covered by this Warranty Limited Lifetime WarrantyCFM Corporation