Meco 6623S8E641 manual How to Perform a Leak Test First Time USE and as required

Page 25

25

How to Perform A Leak Test “FIRST TIME USE” and as required

Supplies Needed for a Leak Test:

Clean paint brush

Water

Dish washing liquid

1.Use an LP Gas Cylinder equipped with an OPD (Overfill Prevention Device) and have it filled at an authorized LP gas dealer by a qualified attendant.

2.Make sure all grill Control Panel Knobs are turned to the “Off” position and verify that the LP Gas Cylinder valve is closed by turning the knob on the LP Gas Cylinder clockwise until it stops.

3.Mix one part of water with one part of dish washing liquid.

4.With the regulator hose connected to the LP Gas Cylinder, turn the knob on the Cylinder counterclockwise. (Fig. 1)

 

Fig. 1

Check for leaks at

 

 

Coupling

 

Cylinder Valve and

 

Regulator Connection

Nut

 

 

and Fittings

 

 

 

 

Fig. 2

5.Check for leaks by brushing the soap solution on all gas valves, hose connections and fittings. (Shown by the heavy arrows in Fig. 2 & 3) Make sure you generously brush the locations with the soap solution, completely surrounding the connections and fittings.

Fig. 3

Image 25
Contents For Outdoor Household Use Only. Not for Commercial Use 6623S8E6416623S8Y641Carbon Monoxide Hazard Tools Required for AssemblyPreparation for Assembly ContentsParts Illustration Model 6623S8E641 Key Description Quantity Parts List- Model 6623S8E641Description Quantity Parts Illustration Model 6623S8Y641 Parts List- Model 6623S8Y641 Step Front Leg Frame Assembly Assembly InstructionsStep Rear Leg Frame Assembly Step Rear Crossbrace Assembly Step Side Table Support Assembly Step Cart Frame AssemblyStep Heat Shield Assembly Step Side Tables to Cart Frame AssemblyStep Shroud Assembly Step Shroud to Cart Assembly Step Manifold AssemblyWheel Assembly Model 6623S8E641 Step Wheel Assembly Model 6623S8Y641Step Cylinder Blocking Wires Assembly Step Main Burner Assembly Step Drip Cup Wire AssemblyBrace Wire Attachment Step Bowl and Cylinder Heat Shield AssemblyStep Side Burner Assembly Step Side Burner Electrode AssemblyElectrode Wire Plug Assembly Step Main Burner Electrode AssemblyStep Hood/Hinge Assembly Thermometer Assembly Model 6623S8Y641 onlyStep Hood Handle Step Cooking Grid / Control Knob Assembly Step Flavor Activator / Warming Rack AssemblyCylinder Retainer Wire Assembly Step Drip Cup AssemblyStep Battery in Igniter Installation Using Gas Connecting/Disconnecting the GasLP Gas Cylinder LP Hose and Regulator Connecting LP Gas CylinderInstallation Codes Before Using Your LP Gas GrillSelecting a Location Performing a Leak TestHow to Perform a Leak Test First Time USE and as required Check The Flame Lighting the Grill Using the Pulse-Spark IgnitorManual Lighting of the Grill on Manually Lighting the Grill Manually Lighting the Side Burner Lighting the Side BurnerManually Lighting the Side Burner Grill Cooking Direct Method Cooking On the Gas GrillDirect Cooking on the Grids Roasting Indirect MethodIndirect Cooking Roasting End of Cooking Session Warming RackCleaning the Grill Care and MaintenanceHow to Clean the Burners 16 gap Storage Emergencies TroubleshootingMaintenance Clean the Burners. See How to Clean Burners in CareSee How to Clean Burners in Care and Maintenance Important Notice Meco Corporation Limited Warranty Limited Warranty