Zenoah EDG2300R manual Set up, SE1 SE2 SE3, Front grip Chuck unit

Page 18

SE1

SE2

SE3

English

5. Set up

1.Assemble the front grip witch is supplied with the unit to the gear case.

2.Screw the chuck unit into the drive shaft (clockwise).

(1)Front grip

(2)Chuck unit

3.Insert the drill bit to be used after opening the chuck by the chuck handle and tighten the chuck by the handle.

(3) Chuck handle

Selection of a Suitable Bit

Choose a drill bit according to material to be drilled.

18

Image 18
Contents EDG2300R Contents Tables des matieres Contenido Specifications Parts locationEDG2300R Emplacement des pieces Situación de las piezas Fiche techniqueEspecificaciohes Position Symbols on the machineImportant Engine Information Emission ControlEmplacement PosiciónControl DE Emisiones For safe operation Consignes de securite Instrucciones de seguridad Work Gear and Clothing Avertissement Concernant Manipulation DE Carburant Consignes de securite Instrucciones de seguridadEquipement ET Vêtements DE Travail Equipo Y Prendas DE TrabajoThings to Check Before Using Your Portable GAS Drill Things to Check Before Starting UP the EngineVerifications a Effectuer Avant DE Demarrer LE Moteur Avoid Noise Problem Evitar Problemas DE Ruido Eviter LES Nuisances SonoresPortable GAS Drill Consignes de securite Instrucciones de seguridad Front grip Chuck unit Set upSE1 SE2 SE3 Chuck handle Selection of a Suitable BitLevier du mandrin Sélection d’un trépan approprié Assemblage MontajeAgarradera Levier Palanquita del portabrocaWhen using RedMax/ZENOAH genuine oil FuelRecommended Mixing Ratio Gasoline 50OIL Avertissement Advertencia Rapport DE Melange Recommande Essence 50 HuileCarburant Combustible Proporción DE LA Mezcla Recomendada Gasolina 50 AceiteHOW to MIX Fuel Fueling the UnitFor Your Engine LIFE, Avoid Eviter Pour Prolonger LA Duree DE VIE DU Moteur Comment Obtenir UN BON Melange Como Mezclar EL CombustibleRemplissage DU Reservoir Abastecimiento DE LA UnidadFuel Combustible SIN Aceite Gasolina Cruda Operation Fonctionnement Uso Stopping Engine How to operate Reverse control OP8OP5 OP6 OP7 OP8 RUN Stop Boring Operation OP6, OP7Marche Comment opérer la commande inverseFonctionnement Uso Levier Cómo operar el control de ReversiónWhen Install or Loosen the Chuck More Securely OP10,11 Adjustment of Idling SpeedIdle adjustment screw OP9 OP10 OP11Tornillo de ajuste de ralentí Vis de réglage du ralentiClé de 19 mm Levier de verrouillage Llave fija de 19 mm Palanca de bloqueoMaintenance Maintenance ChartTableau D’ENTRETIEN EntretienMantenimiento Tabla DE MantenimientoInspection Every 25 Hours MA1 MA2Daily Inspection MA3Entretien Mantenimiento Cleaning the cylinder fins StorageDisposal Nettoyage des ailettes du cylindre Rangement AlmacenamientoMise au rebut Eliminación Limpieza de las aletas del cilindroTroubleshooting guide 11. Guía de localización y solución de problemasGuide de localisation des pannes EDG2300R NotaParts list Gear Case a Engine Unit EDG2300R S/N 60000101 and up Qty Key# Part Number Description Limited Warranty There are no Other Express WarrantiesGarantie limitée Garantía Limitada No Existen Otras Garantías ExpresasPage Zenoah AMERICA, INC