Vanguard Managed Solutions MBDV41 Vertical Termination Configurations, Venting with One 90 Elbow

Page 13

OWNER’S MANUAL

VENTING INSTALLATION

Continued

3.Lower the support box through the hole in the roof until the bottom of the box extends at least 2" below the ceiling (see Figure 23). Align the support box vertically and horizontally using a level. Temporarily tack the support box in place through the inside walls and into the roof sheathing.

4.Using tin snips, cut the support box from the top corners down to the roofline and fold the resulting flaps over the roof sheathing (see Figure 24). Apply a bead of non-hardening mastic around the top edges of the support box to make a seal between the box and the roof. Nail in place with roofing nails. Remove any combustible material that might be in- side of the support box.

5.Complete the cathedral ceiling instal- lation by following the same proce- dures outlined in steps 2 through 7 for Flat Ceiling Installation, page 12.

Level

Cathedral ceiling support box

2" minimum below finished ceiling

Vertical Termination Configurations

Figures 25 through 28 show four different configurations for vertical termination. All connections must be sealed with high temperature silicone sealant as specified in the second warning on page 7.

Venting with Two 90° Elbows

Vertical (V)

Horizontal (H1) +

 

Horizontal (H2)

5' min.

2' max.

6' min.

4' max.

7' min.

6' max.

8' min.

8' max.

20' max.

8' max.

Note: Install restrictor into 4" collar of stove as shown.

Figure 25 - Vertical Rigid Venting Configuration Using Two 90° Elbows with Two

Horizontal Runs

Cut hole 1/8" larger than support box when projected onto roofline

Figure 23 - Cathedral Ceiling Support Box Installation

Note: Install restrictor into 4" collar of stove as shown.

Venting with One 90° Elbow

Vertical (V)

Horizontal (H)

5' min.

2' max.

6' min.

4' max.

7' min.

6' max.

8' min.

8' max.

20' max.

8' max.

Non-hardening Mastic under all edges of support box before nailing

Figure 24 - Installed Cathedral Ceiling

Figure 26 - Vertical Rigid Venting Configuration Using One 90° Elbow

 

Support Box

Continued

106497

13

Image 13
Contents For Your Safety OWNER’S Operation and Installation ManualCheck Local Codes Prior to Installation MBDV37 and MBDV41Safety Information Local Codes Product FeaturesGlossary Terms Product IdentificationClearances PRE-INSTALLATION PreparationLocation and Space Requirements Framing and FinishingLocation of Vent Termination PRE-INSTALLATION Preparation General VentingGeneral Venting Installation Precautions Venting InstallationInstallation Planning Installing Vent System in a Chase Installation for Horizontal TerminationVent Opening Requirements Horizontal Venting Horizontal Termination ConfigurationsVenting with Two 90 Elbows Flat Ceiling Installation Installation for Vertical TerminationCathedral Ceiling Installation Connect a section of pipe and extend up through the holeVenting with One 90 Elbow Vertical Termination ConfigurationsVertical Venting Vertical Rigid Venting Configuration Using Two 90 ElbowsParts Lists for Venting Kits and Components High Altitude InstallationVanguard Rigid Venting Vanguard Flexible VentingElectrical Hookup for Blower Accessory Fireplace InstallationCheck GAS Type Number Description Available from Desa InternationalInstalling GA3700 Blower Blower Assembly and OperationSome Models Have Blower Assembly Preinstalled Open lower louver panel or remove for easier accessWireless HAND-HELD Remote Control Ghrc Series Installation Wall Switch InstallationInstalling Receiver Installation Items Needed Installing GAS Piping to Fireplace LocationGAS Supply Testing Connecting Fireplace to GAS SupplyInstallation Items Needed Pressure Testing Gas Supply Piping SystemClose equipment shutoff valve see Fig- ure Pressure Testing Fireplace Gas ConnectionsRemoving/Replacing Glass Door REMOVING/REPLACING Glass DoorTighten all bracket screws Installing Optional Brick Liner D8037A/D8041Replace glass door see Fireplace Models MBDV37 and MBDV41 Installing LOGS, Lava Rock and Glowing EmbersOperating Guidelines and Maintenance Instructions Manual Lighting Procedure To Appliance For Your Safety Read Before LightingOperating Fireplace Lighting To Turn OFF GASInspecting Burners Pilot AssemblyRemote Operation Operating BlowerGlass Door Cleaning and MaintenancePilot and Burners LogsMain Burner Orifice and Pilot Orifice Before YOU BeginFinal Preparation GAS Control Valve ConversionObserved Problem Possible Cause TroubleshootingParts, Trying to light the fireplacePilot’s millivoltage OrificeBurner is lit Delayed ignition burner Manifold pressure is too lowPane/LP or natural gas company Glass soots Flame impingement on logsAbove Gas leak. See Warning statementTechnical Service Replacement Parts Wiring DiagramService Hints SpecificationsMBDV37 MBDV41 Illustrated Parts BreakdownDIRECT-VENT Fireplace MBDV37 MBDV41 Parts ListWall Mount ON/OFF Switch KIT GWMS2 AccessoriesCleaning KIT GCK Brass Louver KIT106497 Warranty Information