Vanguard Managed Solutions MBDV41, MBDV37 High Altitude Installation, Vanguard Rigid Venting

Page 15

OWNER’S MANUAL

VENTING INSTALLATION

Continued

HIGH ALTITUDE

INSTALLATION

Your Vanguard direct-vent fireplace has been AGA tested and approved for eleva- tions from 0-2000 feet and CGA certified for elevations from 0-4500 feet.

When installing this fireplace at an elevation above 2000 feet (in the USA), you may need to decrease the input rating by changing the existing burner orifice to a smaller size. Re- duce input 4% for each 1000 feet above sea level. Check with your local gas company for proper orifice size identification.

When installing this fireplace at an eleva- tion above 4500 feet (in Canada), check with local authorities.

Consult your local gas company to help de- termine the proper orifice for your location.

For assistance with any high altitude instal- lation contact DESA International’s Tech- nical Service Department at 1-800-DESA- LOG (1-800-337-2564).

PARTS LISTS FOR VENTING KITS AND COMPONENTS

Note: Terminations are not designed for installation prior to transportation.

Vanguard Rigid Venting

Number Description

MDV9K 9' Vertical Vent Kit

Includes one each: 48" Pipe, 36"

Pipe, 24" Pipe, 30° Elbow,

Firestop, Roof Flashing, Storm

Collar, Flue Restrictor Disc, and

Vertical Termination Cap

MDVGFK Ground Floor Horizontal Vent

Kit (Allows horizontal installations

that run 49.5" min. vertically and 15" horizontally from the back of the fire- place to the outside wall.)

Includes one each: 12" Pipe, 7"-12" Adjustable Pipe, 30° Elbow, 90° Elbow, Firestop, Vinyl Stand- off,andHorizontalTerminationCap

BGFVK Basic Ground Floor Rigid Vent Kit

Includes:7"x60°Elbow,Extended Adjustable Horizontal Termina- tion, Wall Thimble and 14 Screws

Vanguard Rigid Venting (Cont.)

Number Description

GFVK

Ground Floor Rigid Vent Kit

 

Includes: 7" x 60° Elbow, 7" Ad-

 

justable Galvanized Coaxial Pipe

 

(7-12"), Wall Thimble, Horizontal

 

Termination, RTV Silicone and 16

 

Screws

BVK

Basement Rigid Vent Kit

 

Includes: 7" x 30° Elbow, 7" x 4'

 

Galvanized Pipe, 7" x 90° Elbow,

 

7" Adjustable Galvanized Pipe (7-

 

12"), Wall Thimble, Horizontal

 

Termination, RTV Silicone and

 

20 Screws

CVK

Corner Vent Kit

 

Includes: 7" x 30° Elbow, 7" x

 

90° Elbow, 7" Adjustable Galva-

 

nized Pipe (7-12"), 6" Pipe, Wall

 

Thimble, Horizontal Termina-

 

tion, RTV Silicone and 20 Screws

SVK

Snorkel Rigid Vent Kit

 

Includes: 7" x 30° Elbow, 7" x 4'

 

Galvanized Pipe, 7" x 90° El-

 

bow, 7" Adjustable Galvanized

 

Pipe (7-12"), Wall Thimble, 36"

 

Snorkel Termination, RTV Sili-

 

cone and 28 Screws

RVF

Roof Rigid Vent Kit

 

Includes: Flue Restrictor, Storm

 

Collar, 7" x 30° Elbow, 7" x 4'

 

Galvanized Pipe, 7" x 2' Galva-

 

nized Pipe, 7" Adjustable Gal-

 

vanized Pipe (7-12"), Firestop

 

Support, Roof Flashing, RTV

 

Silicone, Vertical Termination,

 

and 26 screws

D1000

7" x 12" Galvanized Coaxial

 

Pipe(6 pcs.)

D1010

7" x 24" Galvanized Coaxial

 

Pipe(6 pcs.)

D1020

7" x 48" Galvanized Coaxial

 

Pipe(6 pcs.)

D1030

7" Adjustable (7-12")

 

Galvanized Coaxial Pipe

 

(6 pcs.)

D1050

7" x 6" Galvanized Coaxial Pipe

 

(6 pcs.)

D2000

7" x 90° Elbow (6 pcs.)

D2010

7" x 45° Elbow (6 pcs.)

D2020

7" x 30° Elbow (6 pcs.)

Vanguard Rigid Venting (Cont.)

Number Description

D2030 7" x 60° Elbow (6 pcs.)

D2060 7" x 45° Starter Elbow

D3000 Wall Strap/Offset Support (6 pcs.)

D3010 Storm Collar (6 pcs.)

D3020 Wall Thimble (6 pcs.)

D3050 Vertical Restrictor (6 pcs.)

D3060 CeilingFirestop/Support(6pcs.)

D3070 Rectangular Horizontal Rigid Vent Termination Cap

D3071 Adjustable Horizontal Rigid Vent Termination Cap

D3090 Cathedral Ceiling Support Box

D4000 Roof Flashing 6/12-9/12

D4010 Roof Flashing 9/12-12/12

D4020 Flex Connector (6 pcs.)

D4030 Flex Wall Thimble (6 pcs.)

D4040 4" Hose Clamp (6 pcs.)

D4050 7" Hose Clamp (6 pcs.)

D5000 Wood/Vinyl Siding Standoff (6 pcs.)

Vanguard Flexible Venting

Number Description

BFGFVK Basic Flex Ground Floor Vent Kit

Includes: Flex Adapter, 7" x 2'

Flexible Pipe, 4" x 2' Flexible

Pipe, Wall Thimble, Horizontal

Termination, (2) Spacer Springs,

(2)4" Hose Clamps, (2) 7" Hose Clamps, and 10 Screws

FGFVK Flex Ground Floor Vent Kit

Includes: Flex Adapter, 7" x 4' Flexible Pipe, 4" x 4' Flexible Pipe, Wall Thimble, Horizontal Termi- nation, (4) Spacer Springs, (2) 4" HoseClamps,(2)7"HoseClamps, RTV Silicone, and 10 Screws

D1040 7" x 25' Coaxial Flex Pipe

with Spacer Springs

D3080 Rectangular Horizontal Flex

Termination Cap

Continued

106497

15

Image 15
Contents MBDV37 and MBDV41 OWNER’S Operation and Installation ManualFor Your Safety Check Local Codes Prior to InstallationSafety Information Product Identification Product FeaturesLocal Codes Glossary TermsFraming and Finishing PRE-INSTALLATION PreparationClearances Location and Space RequirementsLocation of Vent Termination PRE-INSTALLATION Preparation General VentingGeneral Venting Venting Installation Installation PrecautionsInstallation Planning Installing Vent System in a Chase Installation for Horizontal TerminationVent Opening Requirements Horizontal Venting Horizontal Termination ConfigurationsVenting with Two 90 Elbows Connect a section of pipe and extend up through the hole Installation for Vertical TerminationFlat Ceiling Installation Cathedral Ceiling InstallationVenting with One 90 Elbow Vertical Termination ConfigurationsVertical Venting Vertical Rigid Venting Configuration Using Two 90 ElbowsVanguard Flexible Venting High Altitude InstallationParts Lists for Venting Kits and Components Vanguard Rigid VentingNumber Description Available from Desa International Fireplace InstallationElectrical Hookup for Blower Accessory Check GAS TypeOpen lower louver panel or remove for easier access Blower Assembly and OperationInstalling GA3700 Blower Some Models Have Blower Assembly PreinstalledWall Switch Installation Wireless HAND-HELD Remote Control Ghrc Series InstallationInstalling Receiver Installation Items Needed Installing GAS Piping to Fireplace LocationPressure Testing Gas Supply Piping System Connecting Fireplace to GAS SupplyGAS Supply Testing Installation Items NeededClose equipment shutoff valve see Fig- ure Pressure Testing Fireplace Gas ConnectionsRemoving/Replacing Glass Door REMOVING/REPLACING Glass DoorInstalling Optional Brick Liner D8037A/D8041 Tighten all bracket screwsReplace glass door see Fireplace Models MBDV37 and MBDV41 Installing LOGS, Lava Rock and Glowing EmbersOperating Guidelines and Maintenance Instructions Lighting To Turn OFF GAS To Appliance For Your Safety Read Before LightingManual Lighting Procedure Operating FireplaceOperating Blower Pilot AssemblyInspecting Burners Remote OperationLogs Cleaning and MaintenanceGlass Door Pilot and BurnersMain Burner Orifice and Pilot Orifice Before YOU BeginFinal Preparation GAS Control Valve ConversionObserved Problem Possible Cause TroubleshootingOrifice Trying to light the fireplaceParts, Pilot’s millivoltageGlass soots Flame impingement on logs Delayed ignition burner Manifold pressure is too lowBurner is lit Pane/LP or natural gas companyAbove Gas leak. See Warning statementSpecifications Replacement Parts Wiring DiagramTechnical Service Service HintsMBDV37 MBDV41 Illustrated Parts BreakdownDIRECT-VENT Fireplace MBDV37 MBDV41 Parts ListBrass Louver KIT AccessoriesWall Mount ON/OFF Switch KIT GWMS2 Cleaning KIT GCK106497 Warranty Information