Desa (V)T32EN-A Series, (V)T32EP-A Series High Altitude Installation, Desa 5/8 Pipe & Vent Kits

Page 15

VENTING INSTALLATION INSTRUCTIONS

Installation for Vertical Termination (Cont.) High Altitude Installation Parts List for Venting Kits and Components

15

VENTING INSTALLATION INSTRUCTIONS

Continued

PARTS LIST FOR VENTING KITS AND COMPONENTS

DESA (5"/8") Pipe & Vent Kits

Number Description

HIGH ALTITUDE INSTALLATION

Your DESA direct-vent fireplace has been tested and approved for elevations from 0-2000 feet (USA) and elevations from 0-4500 feet (Canada) .

When installing this fireplace at an elevation above 2000 feet (in the USA), you may need to decrease the input rating by changing the existing burner orifice to a smaller size. Reduce input 4% for each 1000 feet above sea level. Check with your local gas company for proper orifice size identification.

When installing this fireplace at an elevation above 4500 feet (in Canada), check with local authorities.

Consult your local gas company to help determine the proper orifice for your location.

For assistance with any high altitude installation contact DESAʼs Customer Service Department at 1-866-672-6040.

P58-6

6" Section Double Wall Pipe, Galvanized

P58-12

12" Section Double Wall Pipe, Galvanized

P58-24

24" Section Double Wall Pipe, Galvanized

P58-36

36" Section Double Wall Pipe, Galvanized

P58-48

48" Section Double Wall Pipe, Galvanized

PA58-712

Adjustable 7"-12" Section Double Wall Pipe, Galva-

 

nized

E58-45

45° Elbow, Galvanized

E58-90

90° Elbow, Galvanized

VKG-58

Ground Floor Vent Kit, Galvanized (Includes: 45° El-

 

bow, 7"-12"Adjustable Pipe, Wall Firestop, Horizontal

 

Square Termination, 16 Screws)

VKB-58

Basement Vent Kit, Galvanized (Includes: 45° Elbow,

 

7"-12" Adjustable Pipe, Wall Firestop, Horizontal

 

Square Termination, 4' Pipe, 90° Elbow, 20 Screws)

VKS-58

Snorkel Vent Kit, Galvanized (Includes: 45° Elbow,

 

7"-12" Adjustable Pipe, Wall Firestop, 36" Snorkel

 

Termination, 4' Pipe, 1' Pipe, 90° Elbow, 26 Screws)

VKR-58

Roof Vent Kit, Galvanized (Includes: 45° Elbow, 7"-12"

 

Adjustable Pipe, Flue Restrictor, Vertical High Wind

 

Termination, 2' Pipe, 4' Pipe, Wall Firestop, Storm

 

Collar, Roof Flashing [0/12 - 6/12], 26 Screws)

VKC-58

Corner Vent Kit, Galvanized (Includes 45° Elbow,

 

7"-12" Adjustable Pipe, Wall Firestop, Horizontal

 

Termination, 6" Pipe, 90° Elbow, 18 Screws)

HTK-58

Horizontal Round Termination Kit (Includes Round

 

Termination, Wall Firestop, 45° Elbow)

HT-58

Horizontal Round Termination, Galvanized

HTS-58

Horizontal Square Termination, Galvanized

HTKS-58

Horizontal Square Termination Kit (Includes: Square

 

Termination, Wall Firestop, 45° Elbow)

HTS-58

Horizontal Square Termination, Galvanized

VT-58

Vertical Round Termination, Galvanized

ST-58-14

14" Snorkel Termination, Galvanized

ST-58-36

36" Snorkel Termination, Galvanized

SC-58

Storm Collar, Galvanized

WF-58

Wall Firestop, Galvanized

RF-58-6

Roof Flashing - 0 to 6/12 Pitch, Galvanized

RF-58-12

Roof Flashing - 6/12 to 12/12 Pitch, Galvanized

VR-58

Vertical Restrictor, Galvanized

S-58

Vinyl Siding Standoff, Galvanized

WS-58

Wall Strap

CS-58

Cathedral Ceiling Support

FP-58

Firestop Plate

SF-58

Stucco Flashing - For use with HTS-58

116647-01A

www.desatech.com

Image 15
Contents For Your Safety For Your Safety What to do if YOU Smell GASSave this manual for future reference Safety Information Table of ContentsLocal Codes Safety Information Product IdentificationProduct Features PRE-INSTALLATION PreparationLocation and Space Requirements Framing and Finishing ClearancesTermination CAP AIR Supply Inlet GAS Meter Location of Termination CAPHorizontal Termination Installation Venting Installation InstructionsInstallation Precautions Installation PlanningVent Pipe Connections Any wall. This will cause a fire hazardConnecting Vent Cap with Horizontal Vent Pipe Vertical Horizontal H Venting InstallationInstructions Horizontal Termination ConfigurationsVenting with Two 90 Elbows Horizontal H Vertical Min Max 12 max 18 max 20 max20 max Max Installation for Vertical Termination Horizontal H 1 +Vertical Horizontal H Min Max 12 max 18 max 20 max Flat Ceiling Installation Vertical Termination ConfigurationsVertical V Horizontal H1 + Horizontal H2 Min Max 20 max Vertical Venting Venting with One 90 ElbowVertical Horizontal H Min Max 20 max Vertical V Horizontal H Min Max 12 max 18 max 20 maxHigh Altitude Installation Desa 5/8 Pipe & Vent KitsNumber Description Installing Optional Blower Accessory Fireplace Installation Check GAS TypeFireplace Installation Model BKT InstallationBlower Wiring Diagram Installation Items Needed Installing GAS Piping to Fireplace LocationConnecting Fireplace to GAS Supply Pressure Testing Gas Supply Piping SystemChecking GAS Connections Removing Glass Door Pressure Testing Fireplace Gas ConnectionsCleaning Glass Door REMOVING/REPLACING Glass DoorInstalling LOGS, Lava Rock and Glowing Embers Installing Optional Brick Liner Model BL32DInstalling Logs No and No For Your Safety Read Before Lighting Wiring DiagramWall Switch Installation Optional Remote ControlOptional Remote Operating Optional Blower AccessoryLighting To Turn OFF GAS To ApplianceGlass Door Cleaning MaintenancePilot Assembly Inspecting BurnersPilot and Burners LogsVenting System Observed Problem Possible Cause Remedy TroubleshootingTop Gas leak. See Warning statement atParts Under Warranty Replacement PartsSpecifications Service Hints Technical ServiceIllustrated Parts Breakdown Illustrated Parts BreakdownParts List Parts List109 Burner Assembly ModelsKEY Part Number Description QTY Accessories Owners Registration Form Postage Required 116647-01A Keep this Warranty Warranty Information