Desa P), (V) CD36T(N, (V) CD36R(N PRE-INSTALATION Preparation, Clearances, Framing and Finishing

Page 5

PRE-INSTALLATION PREPARATION

Clearances 5

Framing and Finishing

PRE-INSTALATION

PREPARATION

Continued

PACKAGING AND REMOVAL

The (V)CD36R/T direct vent gas fireplace heater is packaged with:

-one box containg a 4-log set located on the burner in the firebox.

-one bag containing the owner’s manual with installation

instructions, operator’s guide, and warranty information.

-one bag of glowing ember material.

-one bag of vermiculite hearth treatments.

Remove the shrinkwrap securing the 2 carton trays to the unit. Lift the top carton tray off and remove the four corner posts. Discard the bottom tray once the unit is moved into position.

Note: On rear vent models you must remove the fiberboard collar protector located on the rear collar before installing the fireplace and venting system. See Figure 4.

CLEARANCES

Minimum clearances to combustibles for the fireplace are as follows:

Back, and sides

0” (0 mm)

Perpendicular walls

12” (305 mm)

Floor

0” (0 mm)

Ceiling to louver opening

40” (1016 mm)

Front

36” (914 mm)

Top

0” (0 mm)

Vent Surfaces

1” (26 mm) (See venting instructions

 

for specifics on vent clearances.)

Mantel Clearances

(See - Mantel Clearances for specific

 

clearances to combustible mantels.)

Combustible material with a maximum thickness of 5/8” (16 mm) may be flush with the top and sides of the front face of the fireplace.

FRAMING AND FINISHING

Figure 5 shows typical framing of this fireplace. Figure 6 shows framing for corner installation. All minimum clearances must be met.

For overall unit dimensions, framing allowances, and vent collar locations, see Unit Dimensions, Figure 9 on page 6.

For available accessories for this fireplace, see Accessories on page

37.If you are using a seperate combustible mantel piece, refer to Figures 7 and 8 for proper height and clearances. You can install a noncombustible mantel at any height above the fireplace opening. Note: Non-combustible mantels may discolor!

FIBERBOARD

COLLAR PROTECTOR

Figure 4 - Removing Collar Protector (Rear Vent) Fireplace

2x - VERTICAL DOUBLE STUD

36"

(914 mm)

36 1/4" (921 mm)

14 3/4" (375 mm)

Figure 5 - Framing Clearances for Flush, Wall Installation

 

2 1/2" (63 mm)

THESE DIMENSIONS ALLOW

6 5/8" ( 168 mm)

MIN. 1" (26 mm)

FOR 1" OF CLEARANCE

 

AT THE SIDES AND BACK

TO CENTER

 

 

OF THE FIREPLACE

OF REAR VENT

 

14 3/4"

HOWEVER, 0" CLEARANCE

 

 

 

IS ALSO PERMITTED AT

 

 

ALL SIDES WHEN FRAMED

21" (533 mm)

 

 

TO CENTER OF

 

 

TOP VENT

 

 

28 5/8"

 

14 3/4"

(727 mm)

 

 

(375 mm)

 

 

 

 

TO NAILING

 

 

FLANGES

 

 

12 1/4"

 

 

(311 mm)

 

 

TO

 

56 3/4"

OPENING

 

 

 

(1441 mm)

 

Figure 6 - Framing Clearances for Corner Installation

116035-01B

www.desatech.com

Image 5
Contents For Your Safety OWNER’S Operation Installation ManualFor Your Safety What to do if YOU Smell GAS Dedicated Rear and TOP Vent FireplacesSafety Information Local Codes Safety Information Product IdentificationPRE-INSTALLATION Preparation Product FeaturesFraming and Finishing PRE-INSTALATION PreparationClearances Mantel Clearances Unit DimensionsMinimum Clearances for Termination Cap Location of Termination CAPInstallation Precautions Venting Installation InstructionsInstallation Planning Installing Siding Standoff With Vinyl Siding Horizontal Termination ConfigurationGround Floor Installation TOP Vent Venting with Three 90 Elbows Venting with Two 90 ElbowsFlat Ceiling Installation Vertical Termination Configurations Number Description Parts Lists for Venting Kits and ComponentsVertical Venting Electrical Supply Connection Optional Blower InstallationModel BK Installation Model BKT Installation Wiring Diagram Decal Front of BlowerMillivolt Wiring Scheme Wiring DiagramsInstalling Optional Wall Mount Switch GWMS2 Installing Optional ControlsInstalling Remote Receiver Receiver Volt Alkaline Battery Terminal Wires Battery ClipInstalling GAS Piping to Fireplace High Altitude InstallationGAS Supply and Piping Check GAS TypeInstallation Items Needed Connecting Fireplace to GAS SupplyNatural From Propane/LPTest Pressures In Excess of 1/2 Psig 3.5 kPa Checking GAS ConnectionsTest Pressures Equal To or Less Than 1/2 Psig 3.5 kPa EquipmentOpen Shutoff Valve ClosedHearth Access and Assembly Operating Fireplace Installing Logs and Glowing EmbersFor Your Safety Read Before Lighting Lighting Instructions Manual Lighting ProcedureTo Turn OFF GAS To Appliance Optional HAND-HELD Remote OperationOperating Fireplace Electronic Ignition System Optional Wireless Remote OperationThermostat Series Model Ghrctb ON/OFF Series Model GhrcbInspecting Burners Glass Door Cleaning and MaintenancePilot and Burners LogsObserved Problem Possible Cause Remedy TroubleshootingInlet gas pressure is too low Gas leak. See Warning statement Ment Parts, Gas leak. See Warning statement at Service Hints Replacement PartsTechnical Service SpecificationsIllustrated Parts Breakdown KEY VCD36RN VCD36TN VCD36RP VCD36TP Description QTY Parts ListIllustrated Parts Breakdown KEY VCD36RN VCD36RP VCD36TN VCD36TP Description QTY 29 2 KEY VCD36RNE VCD36RPE VCD36TNE VCD36TPE Description QTY Accessories 116035-01B OWNER’S Registration Form Industrial Drive Box Bowling Green, KY Page Industrial Drive P.O. Box Model Serial No Date Purchased