Desa (V) CD36R(N, P) Connecting Fireplace to GAS Supply, Installation Items Needed, Natural From

Page 22

22

GAS SUPPLY AND PIPING (Cont)

Installing Gas Piping to Fireplace (Cont.)

Connecting Fireplace to Gas Supply

GAS SUPPLY AND PIPING Continued

INSTALLING GAS PIPING TO FIREPLACE (Cont.)

Installation Items Needed

Before installing fireplace, make sure you have the items listed below:

external regulator (when Propane/LP gas is supplied)

piping (check local codes)

sealant (resistant to propane/LP gas)

equipment shutoff valve *

test gauge connection *

sediment trap

tee joint

pipe wrench

approved flexible gas line with gas connector (if allowed by local codes)

*ACSAdesign-certified equipment shutoff valve with 1/8” NPT tap is an acceptable alternative to test gauge connection. Purchase the CSA design-certified equipment shutoff valve fromyour retailer.

For propane/LP connection only, the installer must supply an external regulator. You must reduce incoming gas pressure to between 11 and 14 inches of water column. If you do not reduce incoming gas pressure, fireplace regulator damage could occur. Install external regulator with the vent pointing down as shown in Figure 47, page 21.

Pointing the vent down protects it from freezing rain or sleet.

CAUTION: Use only new, black iron or steel pipe. Internally-tinned copper tubing may be used in cer- tain areas. Check your local codes. Use pipe of 1/2” inside diameter or greater to allow proper gas volume to fireplace. If pipe is too small, undue loss of volume will occur.

Installation must include an equipment shutoff valve, union and plugged 1/8” NPT tap. Locate NPT tap within reach for test gauge hook up. NPT tap must be upstream from fireplace (see Figure 48).

IMPORTANT: Install main gas valve (equipment shutoff valve) in an accessible lcation. The main gas valve is for turning on or shutting off the gas to the appliance.

Check your building codes for any special requirements for locating equipment shutoff valve to fireplaces.

Apply pipe joint sealant lightly to male NPT threads. This will prevent excess sealant from going into pipe. Excess sealant in pipe could result in clogged fireplace valves.

WARNING: Use pipe joint sealant that is resistant to liquid petroleum (LP) gas.

CONNECTING FIREPLACE TO GAS SUPPLY

CSA Design-Certified Equipment Shutoff Valve with 1/8" NPT Tap*

 

Natural - From

 

Gas Meter (5.5"

 

W.C. to 10.5"

Approved Flexible

W.C. Pressure)

Propane/LP

Gas Line

From External

 

 

Regulator (11"

 

W.C. to 14"

3" Minimum

W.C. Pressure)

 

Cap Pipe Nipple Tee Joint

Sediment Trap/Drip Leg

Figure 48 - Gas Connection

Installation Items Needed

3/4” and a 7/8” open end wrench or adjustable wrench

sealant (resistant to propane/LP gas, not provided)

1.Remove lower louver door panel by lifting up unit disengaged and swing forward and out of the locating slots at the bottom.

2.Route flexible gas line (provided by installer) from equipment shutoff valve to fireplace. Route flexible gas supply line through one of the access holes on each side of the fireplace cabinet.

3.Attach flexible gas line from gas supply to the 1/2” flare fitting provided on the control valve (see Figure 49).

4.Check all gas connections for leaks. See Checking Gas Con- nections.

To Gas Supply

 

(Natural)

Equipment

To External

Shutoff Valve

 

Regulator

1/2” Flare Fitting

(Propane/LP)

 

Flexible Gas Line

Do NOT Kink

Control Valve

Figure 49 - Connecting Flexible Gas Line to Millivolt Valve

www.desatech.com

116035-01B

Image 22
Contents For Your Safety What to do if YOU Smell GAS OWNER’S Operation Installation ManualFor Your Safety Dedicated Rear and TOP Vent FireplacesSafety Information Safety Information Product Identification Local CodesProduct Features PRE-INSTALLATION PreparationClearances PRE-INSTALATION PreparationFraming and Finishing Unit Dimensions Mantel ClearancesLocation of Termination CAP Minimum Clearances for Termination CapVenting Installation Instructions Installation PrecautionsInstallation Planning Installing Siding Standoff Horizontal Termination Configuration With Vinyl SidingGround Floor Installation TOP Vent Venting with Two 90 Elbows Venting with Three 90 ElbowsFlat Ceiling Installation Vertical Termination Configurations Vertical Venting Parts Lists for Venting Kits and ComponentsNumber Description Model BK Installation Optional Blower InstallationElectrical Supply Connection Wiring Diagram Decal Front of Blower Model BKT InstallationWiring Diagrams Millivolt Wiring SchemeInstalling Remote Receiver Installing Optional ControlsInstalling Optional Wall Mount Switch GWMS2 Receiver Volt Alkaline Battery Terminal Wires Battery ClipGAS Supply and Piping High Altitude InstallationInstalling GAS Piping to Fireplace Check GAS TypeNatural From Connecting Fireplace to GAS SupplyInstallation Items Needed Propane/LPTest Pressures Equal To or Less Than 1/2 Psig 3.5 kPa Checking GAS ConnectionsTest Pressures In Excess of 1/2 Psig 3.5 kPa EquipmentOpen Shutoff Valve ClosedHearth Access and Assembly For Your Safety Read Before Lighting Installing Logs and Glowing EmbersOperating Fireplace To Turn OFF GAS To Appliance Manual Lighting ProcedureLighting Instructions Optional HAND-HELD Remote OperationOptional Wireless Remote Operation Operating Fireplace Electronic Ignition SystemON/OFF Series Model Ghrcb Thermostat Series Model GhrctbInspecting Burners Pilot and Burners Cleaning and MaintenanceGlass Door LogsTroubleshooting Observed Problem Possible Cause RemedyInlet gas pressure is too low Gas leak. See Warning statement Ment Parts, Gas leak. See Warning statement at Technical Service Replacement PartsService Hints SpecificationsIllustrated Parts Breakdown Parts List KEY VCD36RN VCD36TN VCD36RP VCD36TP Description QTYIllustrated Parts Breakdown KEY VCD36RN VCD36RP VCD36TN VCD36TP Description QTY 29 2 KEY VCD36RNE VCD36RPE VCD36TNE VCD36TPE Description QTY Accessories 116035-01B OWNER’S Registration Form Industrial Drive Box Bowling Green, KY Page Model Serial No Date Purchased Industrial Drive P.O. Box