Desa T32N-a SERIES High Altitude Installation, Parts list for venting kits and components

Page 16

Venting Installation

instructions

Continued

Vertical Venting

V = 40' max.

Note: Install restrictor into inner collar of fireplace as shown.

45° Elbow

Figure 24 - Vertical Venting Configuration

With No Horizontal Run (Vertical Round

High Wind Termination Shown)

High Altitude Installation

Your DESAdirect-vent fireplace has been tested and approved for elevations from 0-2000 feet (USA) and elevations from 0-4500 feet (Canada).

Fireplaces for High Altitude (models ending in -HA) are for installation above 4000 feet only. These fireplaces are equipped with parts specific for higher altitudes. IMPORTANT: These fireplac- es can NOT be converted to Propane/LP gas.

When installing a non-high altitude fireplace at an elevation above 2000 feet (in the USA), you may need to decrease the input rating by changing the existing burner orifice to a smaller size. Reduce input 4% for each 1000 feet above sea level. Check with your local gas company for proper orifice size identification.

When installing this fireplace at an elevation above 4500 feet (in Canada), check with local authorities.

IMPORTANT: For horizontal installations above 2,000 feet, it is recommended that a 12" extension pipe be added before starter elbow (see Figure 25) and a round horizontal termi- nation be used.

45° Starter

Elbow

12" Extension

Figure 25 - Recommended 12" Extension

for High Altitude Installation

parts list for venting kits and components

DESA (5"/8") Pipe & Vent Kits

Number Description

P58-6 6" Section Double Wall Pipe,

Galvanized

P58-12 12" Section Double Wall Pipe,

Galvanized

P58-24 24" Section Double Wall Pipe,

Galvanized

P58-36 36" Section Double Wall Pipe,

Galvanized

P58-48 48" Section Double Wall Pipe,

Galvanized

PA58-712 Adjustable 7"-12" Section Double

Wall Pipe, Galvanized

E58-45 45° Elbow, Galvanized

E58-90 90° Elbow, Galvanized

VKG-58 Ground Floor Vent Kit, Galvanized

(Includes: 45° Elbow, 7"-12"

Adjustable Pipe, Wall Firestop,

Horizontal Square Termination,

16 Screws)

VKB-58 Basement Vent Kit, Galvanized

(Includes: 45° Elbow, 7"-12"

Adjustable Pipe, Wall Firestop,

Horizontal Square Termination,

4' Pipe, 90° Elbow, 20 Screws)

VKS-58 Snorkel Vent Kit, Galvanized

(Includes: 45° Elbow, 7"-12"

Adjustable Pipe, Wall Firestop,

36" Snorkel Termination, 4' Pipe,

1' Pipe, 90° Elbow, 26 Screws)

16

www.desatech.com

116646-01D

Image 16
Contents Natural GAS Tudor Models VT32N-A Series CGDV32NRPROPANE/LP GAS Tudor Models VT32P-A Series CGDV32PRTable of Contents Safety InformationHigh traffic areas Product Identification Product FeaturesLocal Codes Pre-Installation Preparation Location and space requirementsClearances Proper clearances must be maintainedFraming Clearances for Corner Installation Location of Termination Cap Termination CAP AIR Supply Inlet GAS MeterVenting Installation Instructions Installation PrecautionsInstallation Planning Female Locking Lugs Male SlotsInstalling Siding Standoff Combustible Exterior Venting Installation Square TerminationVertical V Horizontal H Round Termination Kit HTK ShownCorner Installation Horizontal System Installation Using TWO 90 Elbows Venting with Two 90 ElbowsFlat Ceiling Installation Installation for vertical terminationConnect a section of pipe and extend up through the hole Twist-lock the vent cap onto the last section of vent pipe Venting with One 90 Elbow Vertical V Horizontal HHigh Altitude Installation Parts list for venting kits and componentsVertical Venting Desa 5/8 Pipe & Vent Kits Number DescriptionFireplace Installation Installing optional blower accessoryModel BK Installation Check GAS TypePlug in blower power cord Model BKT InstallationPlug in blower power cord to duplex outlet Blower Wiring DiagramInstalling Gas Piping to Fireplace Location Installation Items NeededChecking GAS Connections Connecting Fireplace to GAS SupplyWrong, fireplace may not run properly Pressure Testing Fireplace Gas Connections Installing optional wall Mount Switch gwmS2Test Pressures Equal To or Less Than Psig 3.5 kPa Removing/Replacing Glass Door Installing Remote ReceiverRemoving Louver Panels Installing Optional Brick liner Model BL32D Replace screen/rod assembly by reversing stepCleaning Glass Door Removing Glass DoorInstalling logs, lava rock and glowing embers Close top and bottom louversFor Your Safety Read Before Lighting Operating FireplaceManual Lighting Procedure Lighting InstructionsTo Turn OFF GAS To Appliance Optional Hand-HeldThermostat Series On/Off SeriesOperating optional blower accessory Pilot AssemblyInspecting Burners Operating optional GWMT1 Wall Mounted ThermostatBurner Flame Pattern Cleaning MaintenanceGlass Door Logs Pilot and burnersVenting system Troubleshooting Observed Problem Possible Cause RemedyProblem could be caused by Replace pilot assembly Burner orifice clogged Clean burner see Cleaning Is litDelayed ignition burner After pilot lights, keep gasWhen burner is lit HI position when burner is Improper vent cap installaCold Minute Air in gas line Operate burner until air is MixerGas leak. See Warning Statement aboveReplacement Parts Service HintsTechnical Service SpecificationsAccessories Illustrated Parts Breakdown Parts List Illustrated parts breakdown Burner Base Assembly 116646-01D 116646-01D Keep this Warranty Warranty InformationLimited Warranty DIRECT-VENT Fireplace