Weber 55204 manual Install the thermometer, You will need Thermometer, Install the bottom shelf

Page 25

Installing the Warm-Up™ Baskets

Installing the warming rack

You will need: Warm-Up Baskets

You will need: warming rack.

Insert one end of the Weber Warm-Up Basket into the

Set the warming rack into the slots at the rear of the

front hole at the right side of the inside of the lid. Insert

cooking box.

the other end into the front slot at the left side of the

 

lid. Repeat this same step for the rear warm-up

 

basket using the hole and slot on the inside rear of the

 

lid.

 

Install the thermometer

You will need: Thermometer.

Insert the thermometer into its holder on the right side of the lid.

®

®

Install the bottom shelf

You will need: Bottom shelf.

Set the bottom shelf in place between the two frame connectors underneath the cooking box.

C-6

Image 25
Contents Extinguish any open flames If you smell gas Shut off gas to the applianceLiquid Propane GAS Units only South Hicks Road Customer Service CenterPalatine, IL Contents For Installation in Canada Gas Supply TestingStorage OperatingGenesis Silver-B NG Page Page Page Page Assembly Instructions Continue frame assembly Complete frame assembly Insert casters Add cooking box assembly You will need manifold bracket Install manifold bracketIgniter lock nut with an adjustable wrench or pliers Install igniterGas Catcher Ignition Chamber and the igniter. This Was done to factory test the ignition systemLeaks. Be sure there are no sparks or open Do not use an open flame to check for gasFlames in the area while you check for gas Leaks. This will result in a fire or explosionPage Representative in your region using the contact BARBECUE. Contact the Customer ServiceCheck for gas leaks Or3 turn OFF the gas. do not OperateInstall Lid Install the slide out bottom trayGrease and not allowing grease to flow into Catch panRight swing-up work surface Install the right end trim piece with tool holdersView inside of control panel Shown, do not push the trim piece in all Install the left end trim piece and swing-up workWay and do not add bolts yet Do not use the swing-up work surface as a cutting BoardDo not use the work surface as a cutting board Install the work surfaceYou will need work surface Page Install the bottom shelf Install the thermometerYou will need Thermometer You will need Bottom shelfTo Extinguish LightingSummary lighting instructions are on the control panel Manual Lighting Cooking CleaningStorage Inspection and Cleaning of the Weber Spider Stopper Guards Annual MaintenanceMain Burner Cleaning Procedure General MaintenanceWeber Spider Stopper Guards Replacing Main Burners Crossover Ignition System Operations Burners burn with a yellow or Flame is low when burner is onOrange flame, in conjunction with Smell of gas